Go back to Daily Run Plan [[Daily Run Plans]]
+
Go back to Daily Run Plan [[Daily Run Plans]]<br>
* General considerations
+
 
**  
+
<b>Previously...</b>
 +
** Last night, MCC had a trouble by beam loss at 3C00 BLM till around 11PM.
 +
** After reconstructed optics beam line, we had 10uA for some production runs during OWL.
 +
 
 +
 
 +
 
  
 
<b>Specific mission</b>
 
<b>Specific mission</b>
* Note:  
+
* Note: MCC RF recovery (8:30-11:30AM) Down time<br>
 +
1/ Doug: Series of magnet measurement <: 1hr / no beam/ but beam permit<br>
 +
>> Bdl vs. current (decreasing magnet 375A->0A by 25A)<br>
 +
>> HALOG: [https://logbooks.jlab.org/entry/3387270 Report] <br>
 +
- <b>No controlled access !</b><br>
 +
Once RF recovery is done, <br>
 +
2/ BCM calibration (high beam current 30uA(60 ideal) with FC & empty target)<br>
 +
Instruction:
 +
[http://hallaweb.jlab.org/equipment/BCM/HallA_BCM_linearity.pdf DOC1][http://hallaweb.jlab.org/equipment/BCM/HallA_Unser_0L02_cal.pdf DOC2]
 +
<br>
 +
- Experts will perform this (Dave/Julie/Thir/...)
 +
- Calo. HV off<br>
 +
- If beam is not stable nor acceptable (30uA), we may skip this and go to 3/ <br>
 +
 
 +
 
 +
<b>Update:</b> 11:30PM/ attempt deliver beam at 1PM<br>
 +
<b>Update:</b> 02:08PM/ MCC has a problem LEM error/IOCIN1 issue, no beam...<br>
 +
<b>Update:</b> 03:00PM/ BCM calibration is postponed (delay beam establishing/Hall-D in/unknown capability of beam current)<br>
 +
<b>Update:</b> 03:10PM/ Start to set beam up with Compton chicane (status?)
 +
 
 +
 
 +
 
 +
 
 +
3/ Set up beam through Compton chicane<br>
 +
- Dave starts to turn on laser for warming up<br>
 +
4/ Production Data with stable beam current<br>
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
<b>Upcoming event(Long Term)</b>
 +
* Beam study (Thursday, 3/10)
 +
* BCM calibration
 +
* Target boiling test (60uA)
 +
 
 +
 
  
* Detailed instructions [https://hallaweb.jlab.org/ here]
 
  
  

Latest revision as of 16:55, 3 March 2016

Go back to Daily Run Plan Daily Run Plans

Previously...

    • Last night, MCC had a trouble by beam loss at 3C00 BLM till around 11PM.
    • After reconstructed optics beam line, we had 10uA for some production runs during OWL.



Specific mission

  • Note: MCC RF recovery (8:30-11:30AM) Down time

1/ Doug: Series of magnet measurement <: 1hr / no beam/ but beam permit
>> Bdl vs. current (decreasing magnet 375A->0A by 25A)
>> HALOG: Report
- No controlled access !
Once RF recovery is done,
2/ BCM calibration (high beam current 30uA(60 ideal) with FC & empty target)
Instruction: DOC1DOC2
- Experts will perform this (Dave/Julie/Thir/...) - Calo. HV off
- If beam is not stable nor acceptable (30uA), we may skip this and go to 3/


Update: 11:30PM/ attempt deliver beam at 1PM
Update: 02:08PM/ MCC has a problem LEM error/IOCIN1 issue, no beam...
Update: 03:00PM/ BCM calibration is postponed (delay beam establishing/Hall-D in/unknown capability of beam current)
Update: 03:10PM/ Start to set beam up with Compton chicane (status?)



3/ Set up beam through Compton chicane
- Dave starts to turn on laser for warming up
4/ Production Data with stable beam current




Upcoming event(Long Term)

  • Beam study (Thursday, 3/10)
  • BCM calibration
  • Target boiling test (60uA)



BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++