Difference between revisions of "Friday, Mar. 04: OWL Shift"
From Hall A Wiki
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
<b>Previously...</b> | <b>Previously...</b> | ||
− | * Set up beam through Compton chicane | + | * Set up beam through Compton chicane (Ciprian, Greg, Yves) |
Line 11: | Line 11: | ||
1/ Set up beam through Compton chicane<br> | 1/ Set up beam through Compton chicane<br> | ||
- Ciprian, Greg and Yves are tuning the beam through Compton<br> | - Ciprian, Greg and Yves are tuning the beam through Compton<br> | ||
+ | - Before tune the beam, observe the beam current (how actually we can get tonight but only up to 30uA) | ||
+ | - Spoke to Ciprian/Greg/Dave and they gave a specific monitoring instruction (shift crew will post everything). | ||
+ | - We will give a try ... | ||
+ | |||
2/ Expect some production runs through Compton <br> | 2/ Expect some production runs through Compton <br> | ||
− | + | - 15uA with LH2 | |
+ | - Compton S/B looked great | ||
+ | - Spot++/C12 hole/ Some production runs ! | ||
+ | |||
3/ Agreement with Hall-D and Talked PD to set up the BCM calibration tomorrow<br> | 3/ Agreement with Hall-D and Talked PD to set up the BCM calibration tomorrow<br> | ||
- Crucial: high beam current 30uA with FC & empty target <br> | - Crucial: high beam current 30uA with FC & empty target <br> |
Latest revision as of 09:43, 4 March 2016
Go back to Daily Run Plan Daily Run Plans
Previously...
- Set up beam through Compton chicane (Ciprian, Greg, Yves)
Specific mission
- Note:
1/ Set up beam through Compton chicane
- Ciprian, Greg and Yves are tuning the beam through Compton
- Before tune the beam, observe the beam current (how actually we can get tonight but only up to 30uA) - Spoke to Ciprian/Greg/Dave and they gave a specific monitoring instruction (shift crew will post everything). - We will give a try ...
2/ Expect some production runs through Compton
- 15uA with LH2 - Compton S/B looked great - Spot++/C12 hole/ Some production runs !
3/ Agreement with Hall-D and Talked PD to set up the BCM calibration tomorrow
- Crucial: high beam current 30uA with FC & empty target
- Experts on call (Dave/Julie/Thir/...)
- Calo. HV off
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++