<b>Previously...</b>
 
<b>Previously...</b>
* Set up beam through Compton chicane
+
* Set up beam through Compton chicane (Ciprian, Greg, Yves)
  
  
Line 16: Line 16:
  
 
2/ Expect some production runs through Compton <br>
 
2/ Expect some production runs through Compton <br>
   
+
  - 15uA with LH2
 +
- Compton S/B looked great
 +
- Spot++/C12 hole/ Some production runs !
 +
 
 
3/ Agreement with Hall-D and Talked PD to set up the BCM calibration tomorrow<br>
 
3/ Agreement with Hall-D and Talked PD to set up the BCM calibration tomorrow<br>
 
  - Crucial: high beam current 30uA with FC & empty target <br>
 
  - Crucial: high beam current 30uA with FC & empty target <br>

Latest revision as of 09:43, 4 March 2016

Go back to Daily Run Plan Daily Run Plans


Previously...

  • Set up beam through Compton chicane (Ciprian, Greg, Yves)


Specific mission

  • Note:

1/ Set up beam through Compton chicane

- Ciprian, Greg and Yves  are tuning the beam through Compton
- Before tune the beam, observe the beam current (how actually we can get tonight but only up to 30uA) - Spoke to Ciprian/Greg/Dave and they gave a specific monitoring instruction (shift crew will post everything). - We will give a try ...

2/ Expect some production runs through Compton

- 15uA with LH2 
- Compton S/B looked great
- Spot++/C12 hole/ Some production runs ! 

3/ Agreement with Hall-D and Talked PD to set up the BCM calibration tomorrow

- Crucial: high beam current 30uA with FC & empty target 

Instruction: DOC1DOC2

- Experts on call (Dave/Julie/Thir/...)
- Calo. HV off



BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++