Difference between revisions of "Wednesday, August 17, 2016 11:00am EST"
From Hall A Wiki
(One intermediate revision by the same user not shown) | |||
Line 17: | Line 17: | ||
− | Attending: | + | Attending: Juliette, KK, Jim, Jason, Ernie |
+ | |||
+ | * KK will check out the main file | ||
+ | ** Juliette will fix collimator section | ||
+ | ** Juliette will do a full read-through | ||
+ | ** Jim, Jason and Ernie will look at engineering in 1.3 (rev. 165) | ||
+ | ** early October absolute final date | ||
+ | ** CD1-style review early December | ||
+ | *** technical feasibility (not historical) | ||
+ | * Magnet Review Meeting | ||
+ | ** Director's Review in early December | ||
+ | ** 1/2 day teleconference in "late" October (week of 24th) | ||
+ | ** Four coil scenario most important issue for this | ||
+ | *** Don't need much room for cases between coils | ||
+ | *** water connections should not be an issue | ||
+ | *** vacuum chamber - too long? or multiple chambers? - same single one chamber | ||
+ | ** "air core solenoid" under upstream magnet (low priority, solvable problem) | ||
+ | *** shield field | ||
+ | *** steering field | ||
+ | * Summary of alignment meeting | ||
+ | ** positive; well-prepared for it | ||
+ | ** "mouse-trap" bell-jar idea | ||
+ | *** what if a coil needs to be replaced? - still get it with crane | ||
+ | *** have to disconnect from beamline | ||
+ | *** Jim, Jason, Ernie will make a pro/con list | ||
+ | ** Orchestrate the installation in the Hall | ||
+ | * KK visiting DOE tomorrow | ||
+ | ** Full-size large conductor coil | ||
+ | ** same profile as Jason's | ||
+ | * Next meeting August 31 at 1:30pm EST | ||
+ | |||
<br><br> Return to [[Teleconferences]] | <br><br> Return to [[Teleconferences]] | ||
<br> Return to [[MOLLER at 11 GeV E09-005]] | <br> Return to [[MOLLER at 11 GeV E09-005]] |
Latest revision as of 11:54, 17 August 2016
Last meeting: Wednesday, June 29, 2016 1:30pm EST
Agenda
- Discuss status of CDR
- Magnet Review Meeting (early Oct.?)
- Discuss possible agenda/dates
- Summary of alignment meeting
Minutes
Attending: Juliette, KK, Jim, Jason, Ernie
- KK will check out the main file
- Juliette will fix collimator section
- Juliette will do a full read-through
- Jim, Jason and Ernie will look at engineering in 1.3 (rev. 165)
- early October absolute final date
- CD1-style review early December
- technical feasibility (not historical)
- Magnet Review Meeting
- Director's Review in early December
- 1/2 day teleconference in "late" October (week of 24th)
- Four coil scenario most important issue for this
- Don't need much room for cases between coils
- water connections should not be an issue
- vacuum chamber - too long? or multiple chambers? - same single one chamber
- "air core solenoid" under upstream magnet (low priority, solvable problem)
- shield field
- steering field
- Summary of alignment meeting
- positive; well-prepared for it
- "mouse-trap" bell-jar idea
- what if a coil needs to be replaced? - still get it with crane
- have to disconnect from beamline
- Jim, Jason, Ernie will make a pro/con list
- Orchestrate the installation in the Hall
- KK visiting DOE tomorrow
- Full-size large conductor coil
- same profile as Jason's
- Next meeting August 31 at 1:30pm EST