Difference between revisions of "MAG Meeting, October 24, 2016 12:00pm EST"
From Hall A Wiki
(→Minutes) |
(→Agenda) |
||
(7 intermediate revisions by the same user not shown) | |||
Line 8: | Line 8: | ||
* Overview (KK) [https://hallaweb.jlab.org/wiki/images/9/92/Oct16magintro_1.pdf pdf] | * Overview (KK) [https://hallaweb.jlab.org/wiki/images/9/92/Oct16magintro_1.pdf pdf] | ||
* Spectrometer Update (Juliette) [https://hallaweb.jlab.org/wiki/images/b/b9/Spectrometer_update_v1.pdf pdf] | * Spectrometer Update (Juliette) [https://hallaweb.jlab.org/wiki/images/b/b9/Spectrometer_update_v1.pdf pdf] | ||
− | * Engineering Update (Jim, Ernie, Jason, Chris) [https://hallaweb.jlab.org/wiki/images/ | + | * Engineering Update (Jim, Ernie, Jason, Chris) [https://hallaweb.jlab.org/wiki/images/b/ba/Engineering_public.pdf pdf] |
* Discussion | * Discussion | ||
Line 20: | Line 20: | ||
Attending: | Attending: | ||
− | External Advisors: Steve, Vladimir, Jay, | + | External Advisors: Steve, Vladimir, Jay, Dieter, |
+ | |||
Internal Advisors: Javier, Robin, Kent, Stanley, | Internal Advisors: Javier, Robin, Kent, Stanley, | ||
− | Spectrometer Group: Juliette, KK, Tyler, Ernie, Jason, Seamus | + | |
+ | Spectrometer Group: Juliette, KK, Tyler, Ernie, Jason, Jim, Seamus | ||
* Setup and Welcome | * Setup and Welcome | ||
* Overview (KK) | * Overview (KK) | ||
− | * Spectrometer Update (Juliette) | + | * Spectrometer Update (Juliette) |
− | * | + | ** Roger - 100 W still is a large dose - need to check |
− | * Discussion | + | ** Vladimir - can mitigate Bz spikes with ferromagnets |
+ | ** Kent - optics changes because of changes in position along beamline, not stray fields | ||
+ | ** Jay - pivot check that it is less than ~10 G, also look at G4.10.2 paper on Arxiv about e- scattering | ||
+ | ** Robin - need to show that hybrid mitigates risk more than segmented | ||
+ | * larger conductor (Ernie) | ||
+ | ** Robyn - full ANSYS with deflections | ||
+ | ** Vladimir - shrinkage of coils; shear stress on epoxy (different power supplies) | ||
+ | ** Dieter - shrinkage probably not an issue | ||
+ | ** Jay - power supply specifications, take care of helicity timescale fluctuations | ||
+ | ** Roger - shouldn't hurt you (720 Hz line noise) magnet inductance will take care of this | ||
+ | ** Jay - Pastor/Martin in Hall B have full ANSYS | ||
+ | * vacuum chamber (Jim) | ||
+ | ** buckling of vacuum chamber not an issue (~several times safety factor) | ||
+ | ** need to model manufacturing defects | ||
+ | ** also reversing chamber and having everything attached to bottom will be investigated | ||
+ | * Discussion - Timeline | ||
+ | ** Collaboration Meeting November 11-12, 2016 | ||
+ | ** MIT produce update (drawings and numbers for larger conductor) end of November | ||
+ | ** Receive feedback from committee in early December | ||
+ | ** Director's Review December 15-16, 2016 | ||
+ | ** another teleconference in early March 2017 on manufacturing the prototype | ||
+ | ** another teleconference several months in advance of CD1 review, present results of prototype testing | ||
+ | ** Hopeful for CD1 review in summer 2017 | ||
<br><br> Return to [[Teleconferences]] | <br><br> Return to [[Teleconferences]] | ||
<br> Return to [[MOLLER at 11 GeV E09-005]] | <br> Return to [[MOLLER at 11 GeV E09-005]] |
Latest revision as of 15:04, 24 October 2016
Last meeting: Wednesday, October 19, 2016 2:00pm EST
Agenda
- Setup and Welcome (Juliette)
- Overview (KK) pdf
- Spectrometer Update (Juliette) pdf
- Engineering Update (Jim, Ernie, Jason, Chris) pdf
- Discussion
Minutes
Attending:
External Advisors: Steve, Vladimir, Jay, Dieter,
Internal Advisors: Javier, Robin, Kent, Stanley,
Spectrometer Group: Juliette, KK, Tyler, Ernie, Jason, Jim, Seamus
- Setup and Welcome
- Overview (KK)
- Spectrometer Update (Juliette)
- Roger - 100 W still is a large dose - need to check
- Vladimir - can mitigate Bz spikes with ferromagnets
- Kent - optics changes because of changes in position along beamline, not stray fields
- Jay - pivot check that it is less than ~10 G, also look at G4.10.2 paper on Arxiv about e- scattering
- Robin - need to show that hybrid mitigates risk more than segmented
- larger conductor (Ernie)
- Robyn - full ANSYS with deflections
- Vladimir - shrinkage of coils; shear stress on epoxy (different power supplies)
- Dieter - shrinkage probably not an issue
- Jay - power supply specifications, take care of helicity timescale fluctuations
- Roger - shouldn't hurt you (720 Hz line noise) magnet inductance will take care of this
- Jay - Pastor/Martin in Hall B have full ANSYS
- vacuum chamber (Jim)
- buckling of vacuum chamber not an issue (~several times safety factor)
- need to model manufacturing defects
- also reversing chamber and having everything attached to bottom will be investigated
- Discussion - Timeline
- Collaboration Meeting November 11-12, 2016
- MIT produce update (drawings and numbers for larger conductor) end of November
- Receive feedback from committee in early December
- Director's Review December 15-16, 2016
- another teleconference in early March 2017 on manufacturing the prototype
- another teleconference several months in advance of CD1 review, present results of prototype testing
- Hopeful for CD1 review in summer 2017