Difference between revisions of "September 27th 2024"

From Hall A Wiki
Jump to: navigation, search
(Created page with "*Updates **")
 
 
Line 1: Line 1:
 
*Updates
 
*Updates
**
+
**CDet
 +
***working in Hall on detector
 +
*** starting laying cables
 +
*** still making ribbon to VETROC and Nugent
 +
*** need to test LV supply for NINO
 +
*** turned crate on but need to check with screen - need to pull fiber to TS
 +
*** LV need internet connection : 3 cables
 +
*** cosmics paddles and trigger ? Check with Ralph
 +
**GEM
 +
*** done with low level test for Front tracker will look at back tracker, can take cosmics with front tracker
 +
*** need to connect to TS
 +
*** top crate fibers too short
 +
*** cosmics trigger is ready
 +
**HCAL
 +
*** still need to send trigger to TI
 +
**ECal
 +
***project ready to give to Ben, can implement when crate are ready
 +
***corrected address for FADC : check that all board initialize correctly
 +
**GEM data reduction
 +
*** send fast clear to some MPDs : but need input on MPD
 +
*** VTP data reduction : ECal and HCAL  VTP sends cluster information to GEM VTPs and VTPs send only GEMs strips in region of interest
 +
*** can do it in CODA : at EB all strip information available
 +
**Beamline / helicity
 +
***looked in bunker, saw crate was  moved - Paul will come back in November / December
 +
***need to connect crate to network -
 +
*** patch cable moved - cables a bit long - can leave that was or use shorter cable

Latest revision as of 11:26, 27 September 2024

  • Updates
    • CDet
      • working in Hall on detector
      • starting laying cables
      • still making ribbon to VETROC and Nugent
      • need to test LV supply for NINO
      • turned crate on but need to check with screen - need to pull fiber to TS
      • LV need internet connection : 3 cables
      • cosmics paddles and trigger ? Check with Ralph
    • GEM
      • done with low level test for Front tracker will look at back tracker, can take cosmics with front tracker
      • need to connect to TS
      • top crate fibers too short
      • cosmics trigger is ready
    • HCAL
      • still need to send trigger to TI
    • ECal
      • project ready to give to Ben, can implement when crate are ready
      • corrected address for FADC : check that all board initialize correctly
    • GEM data reduction
      • send fast clear to some MPDs : but need input on MPD
      • VTP data reduction : ECal and HCAL VTP sends cluster information to GEM VTPs and VTPs send only GEMs strips in region of interest
      • can do it in CODA : at EB all strip information available
    • Beamline / helicity
      • looked in bunker, saw crate was moved - Paul will come back in November / December
      • need to connect crate to network -
      • patch cable moved - cables a bit long - can leave that was or use shorter cable