Difference between revisions of "Online analysis: results and pending"
From Hall A Wiki
(→Boiling test) |
|||
(8 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
Back to [[DVCS]] | Back to [[DVCS]] | ||
− | This page is in progress, please new items to it. When you obtain a result, log in into the Halog and link it to this page. | + | This page is in progress, please new items to it. When you obtain a result, log in into the Halog and link it to this page. if you are willing to take charge of a given analysis, please indicate it on this page as well as the date at which you are starting to work on it. |
=Matching data taking with run plans= | =Matching data taking with run plans= | ||
Line 9: | Line 9: | ||
=Luminosity, efficiency= | =Luminosity, efficiency= | ||
− | + | ==Boiling test== | |
* Establish history of the data taking against the boiling test | * Establish history of the data taking against the boiling test | ||
* Analyze data of the boiling test, conclude | * Analyze data of the boiling test, conclude | ||
− | + | ==Trigger efficiency== | |
Analyze data taken on the week-end of 10-09 and 10-10 with T3 and T4 trigger | Analyze data taken on the week-end of 10-09 and 10-10 with T3 and T4 trigger | ||
=LHRS commissioning= | =LHRS commissioning= | ||
− | + | == Calibrate the ADCs: == | |
Still to be done S1, Pion rejector, | Still to be done S1, Pion rejector, | ||
Line 24: | Line 24: | ||
[[http://www.jlab.org/~adaq/halog/html/1010_archive/101009210935.html Cerenkov (partially done, missing cer1, 10-09)]], [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009000125.html S2 (done 10-09)]] | [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009210935.html Cerenkov (partially done, missing cer1, 10-09)]], [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009000125.html S2 (done 10-09)]] | ||
− | + | == Calibrate detector time spectra:== | |
Still to be done : understand timing spectra for S1,S2 and the Cerenkov | Still to be done : understand timing spectra for S1,S2 and the Cerenkov | ||
− | |||
[[http://www.jlab.org/~adaq/halog/html/1010_archive/101009235455.html t0 for VDC (done 10-09)]] | [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009235455.html t0 for VDC (done 10-09)]] | ||
− | + | == LHRS optics run (no sieve/sieve)== | |
− | + | Ye Zhihong is interested in this analysis) | |
− | + | ||
− | + | ||
− | + | ||
+ | ** Establish history of the data taking against the optics run plan. Add run numbers to each step of the plan | ||
+ | ** Define goals of analysis | ||
+ | ** Carry on analysis ( | ||
=DVCS Calorimeter= | =DVCS Calorimeter= |
Latest revision as of 19:16, 10 October 2010
Back to DVCS
This page is in progress, please new items to it. When you obtain a result, log in into the Halog and link it to this page. if you are willing to take charge of a given analysis, please indicate it on this page as well as the date at which you are starting to work on it.
Contents
Matching data taking with run plans
- Update the how to
- Maintain db_run.dat file: Make sure that every LHRS momentum and angle changes are logged
- Start a database of run indicating line by line the run number, the target in position, the average beam current, LHRs pnom, LHRS angle, goal
Luminosity, efficiency
Boiling test
- Establish history of the data taking against the boiling test
- Analyze data of the boiling test, conclude
Trigger efficiency
Analyze data taken on the week-end of 10-09 and 10-10 with T3 and T4 trigger
LHRS commissioning
Calibrate the ADCs:
Still to be done S1, Pion rejector,
[Cerenkov (partially done, missing cer1, 10-09)], [S2 (done 10-09)]
Calibrate detector time spectra:
Still to be done : understand timing spectra for S1,S2 and the Cerenkov
[t0 for VDC (done 10-09)]
LHRS optics run (no sieve/sieve)
Ye Zhihong is interested in this analysis)
- Establish history of the data taking against the optics run plan. Add run numbers to each step of the plan
- Define goals of analysis
- Carry on analysis (