Difference between revisions of "Online analysis: results and pending"

From Hall A Wiki
Jump to: navigation, search
(Boiling test)
 
(8 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
Back to [[DVCS]]
 
Back to [[DVCS]]
  
This page is in progress, please new items to it. When you obtain a result, log in into the Halog and link it to this page.
+
This page is in progress, please new items to it. When you obtain a result, log in into the Halog and link it to this page. if you are willing to take charge of a given analysis, please indicate it on this page as well as the date at which you are starting to work on it.
  
 
=Matching data taking with run plans=
 
=Matching data taking with run plans=
Line 9: Line 9:
  
 
=Luminosity, efficiency=
 
=Luminosity, efficiency=
*Boiling test:
+
==Boiling test==
 
* Establish history of the data taking against the boiling test
 
* Establish history of the data taking against the boiling test
 
* Analyze data of the boiling test, conclude
 
* Analyze data of the boiling test, conclude
  
*Trigger efficiency
+
==Trigger efficiency==
  
 
Analyze data taken on the week-end of 10-09 and 10-10 with T3 and T4 trigger
 
Analyze data taken on the week-end of 10-09 and 10-10 with T3 and T4 trigger
  
 
=LHRS commissioning=
 
=LHRS commissioning=
* Calibrate the ADCs:
+
== Calibrate the ADCs: ==
 
   
 
   
 
Still to be done S1, Pion rejector,
 
Still to be done S1, Pion rejector,
Line 24: Line 24:
 
  [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009210935.html Cerenkov (partially done, missing cer1, 10-09)]], [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009000125.html S2 (done 10-09)]]
 
  [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009210935.html Cerenkov (partially done, missing cer1, 10-09)]], [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009000125.html S2 (done 10-09)]]
  
* Calibrate detector time spectra:
+
== Calibrate detector time spectra:==
 
Still to be done : understand timing spectra for S1,S2 and the Cerenkov
 
Still to be done : understand timing spectra for S1,S2 and the Cerenkov
 
 
  [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009235455.html t0 for VDC (done 10-09)]]
 
  [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009235455.html t0 for VDC (done 10-09)]]
  
* LHRS optics run (no sieve/sieve)
+
== LHRS optics run (no sieve/sieve)==
* Establish history of the data taking against the optics run plan. Add run numbers to each step of the plan
+
Ye Zhihong is interested in this analysis)
* Define goals of analysis
+
* carry on analysis
+
 
+
  
 +
** Establish history of the data taking against the optics run plan. Add run numbers to each step of the plan
 +
** Define goals of analysis
 +
** Carry on analysis (
  
 
=DVCS Calorimeter=
 
=DVCS Calorimeter=

Latest revision as of 19:16, 10 October 2010

Back to DVCS

This page is in progress, please new items to it. When you obtain a result, log in into the Halog and link it to this page. if you are willing to take charge of a given analysis, please indicate it on this page as well as the date at which you are starting to work on it.

Matching data taking with run plans

  • Update the how to
  • Maintain db_run.dat file: Make sure that every LHRS momentum and angle changes are logged
  • Start a database of run indicating line by line the run number, the target in position, the average beam current, LHRs pnom, LHRS angle, goal

Luminosity, efficiency

Boiling test

  • Establish history of the data taking against the boiling test
  • Analyze data of the boiling test, conclude

Trigger efficiency

Analyze data taken on the week-end of 10-09 and 10-10 with T3 and T4 trigger

LHRS commissioning

Calibrate the ADCs:

Still to be done S1, Pion rejector,

[Cerenkov (partially done, missing cer1, 10-09)], [S2 (done 10-09)]

Calibrate detector time spectra:

Still to be done : understand timing spectra for S1,S2 and the Cerenkov

[t0 for VDC (done 10-09)]

LHRS optics run (no sieve/sieve)

Ye Zhihong is interested in this analysis)

    • Establish history of the data taking against the optics run plan. Add run numbers to each step of the plan
    • Define goals of analysis
    • Carry on analysis (

DVCS Calorimeter