Difference between revisions of "G2p documentation"
From Hall A Wiki
Line 6: | Line 6: | ||
*OSP for Polarized Target | *OSP for Polarized Target | ||
*[http://hallaweb.jlab.org/experiment/g2p/meetings/safety_102411/Target_primer_extended_2011.pdf Polarized Target Primer] (draft) | *[http://hallaweb.jlab.org/experiment/g2p/meetings/safety_102411/Target_primer_extended_2011.pdf Polarized Target Primer] (draft) | ||
− | *OSP for Septa | + | *OSP(s) for Septa, HKS and BB power supplies |
− | *OSP for | + | *OSP for FZ Magnets. |
− | *OSP(s) for Hall A | + | *TOSP for Septa field mapping. |
+ | *OSP(s) for Hall A Platforms, Local Dump Access, and 3rd Arm. | ||
*OSP for Beamline systems | *OSP for Beamline systems | ||
Revision as of 16:52, 18 October 2011
- COO : Conduct of Operations.
- ESAD : Experiment Safety Assessment Document.
- Brief Hazard Awareness for RadCon group and ARMS.
- Safety guidelines for Radiation Surveys.
- RSAD : Radiological Safety Analysis Document
- OSP for Polarized Target
- Polarized Target Primer (draft)
- OSP(s) for Septa, HKS and BB power supplies
- OSP for FZ Magnets.
- TOSP for Septa field mapping.
- OSP(s) for Hall A Platforms, Local Dump Access, and 3rd Arm.
- OSP for Beamline systems
Notes
- All documents are in draft state.
- Overview of JLab's Operational Safety Procedure Program.
- JLab OSP template.
- List of previous JLab OSPs
- The source files for all g2p documents are available here
- The SANE experiment Documentation for reference.
- JLab Template for the COO.