***** 5~10 sweeps, check immediately,if not stable, should use 10 sweeps. | ***** 5~10 sweeps, check immediately,if not stable, should use 10 sweeps. | ||
**** do diffusion model ~ 6 hours. Note: | **** do diffusion model ~ 6 hours. Note: | ||
− | ***** '''it is better to use field sweep for diffusion, for field sweep, you need to | + | ***** '''it is better to use field sweep for diffusion, for field sweep, you need to change the phase to get the signal in one axis (X OR Y)''' |
− | ***** '''at the beginning of diffusion test, do one field sweep- do one frequency sweep - do one field sweep - do one frequency sweep, pay attention to changing phase each time''' | + | ***** '''at the beginning of diffusion test, do one field sweep- do one frequency sweep - do one field sweep - do one frequency sweep - do one field sweep, pay attention to changing phase each time''' |
***** 37 sweep *10 min | ***** 37 sweep *10 min | ||
**** wait for another 3~6 hour( polarization is become stable),or we can put it in diffusion test. | **** wait for another 3~6 hour( polarization is become stable),or we can put it in diffusion test. |
Revision as of 12:51, 30 April 2012
- progress
- todo
- Use the Moss cell to check system again.
- if system OK. we will do following (2 weeks):temperature optimization and diffusion test (225~240, may add point 220)
- temperature stabilized ~ 4 hours
- spin up. Note:
- 12sweep * 2 hours ( if spin up time > 6hours),
- 15sweep * 1 hours ( if spin up time < 6hours)
- do EPR
- do internal temperature test. Note:
- do NMR laser on - off - on - off- on, each time temperature should be stabilized, ~ 20min), total: 1.5 hour
- do AFP loss with laser on( temperature stabilized)
- 5~10 sweeps, check immediately,if not stable, should use 10 sweeps.
- do diffusion model ~ 6 hours. Note:
- it is better to use field sweep for diffusion, for field sweep, you need to change the phase to get the signal in one axis (X OR Y)
- at the beginning of diffusion test, do one field sweep- do one frequency sweep - do one field sweep - do one frequency sweep - do one field sweep, pay attention to changing phase each time
- 37 sweep *10 min
- wait for another 3~6 hour( polarization is become stable),or we can put it in diffusion test.
- do AFP loss with laser off,( temperature stabilized, 5~ 10 sweeps),check immediately
- do hot spin-down ~ 18 sweep * 1 hours
- do one cold spin down for this cell after finishing all temperature tests ~18 hours
- Calendar
timeline | Tasks | To be done by | status | |
---|---|---|---|---|
new cell | ||||
04/18-05/02 | receiving from UVa | Jie and Zhiwen | ||
oven bottom piece | ||||
04/18-05/02 | design and make oven bottom piece | Zhiwen and Yawei | ||
04/24-04/27 | set up gradient coil and test | Yawei and Jie | ||
diffusion model measurement | ||||
04/27-05/09 | do the test | all | ||
Dominic test | ||||
05/09-05/19 | set up the comet laser and do the test | all | ||
pulse NMR | ||||
05/19-? | pNMR setup and test | Jie |