Difference between revisions of "Coordinate Detector"

From Hall A Wiki
Jump to: navigation, search
Line 5: Line 5:
 
*[https://hallaweb.jlab.org/wiki/images/d/dc/CoordDet-sketch-support-superstructure.pdf Initial sketch of frame design] by Jason Sharpe.[http://www.ap.smu.ca/~sarty/CoordDet-FrameDraft-2plane-1module-July.pdf More detailed frame design] by Jason Sharpe.
 
*[https://hallaweb.jlab.org/wiki/images/d/dc/CoordDet-sketch-support-superstructure.pdf Initial sketch of frame design] by Jason Sharpe.[http://www.ap.smu.ca/~sarty/CoordDet-FrameDraft-2plane-1module-July.pdf More detailed frame design] by Jason Sharpe.
 
*[https://userweb.jlab.org/~mahbub/SBS_CD_Budget_Jul11_2012.pdf Presentation] by Mahbub at the July 11th 2012 SBS meeting.
 
*[https://userweb.jlab.org/~mahbub/SBS_CD_Budget_Jul11_2012.pdf Presentation] by Mahbub at the July 11th 2012 SBS meeting.
 +
* From Hall B, [https://hallaweb.jlab.org/wiki/images/d/d3/Abs_Dim_3samples.gif plot] of widths and thickness for 3 samples over the length of the bar. [https://hallaweb.jlab.org/wiki/images/4/48/Abs_Dim_JLab_Fnal.gif Plot] comparing FNAL and JLab measurements of the width and thickness of 18 bars.

Revision as of 18:17, 12 July 2012

  • Presentation on the initial idea of the Coordinate detector by Bogdan at an SBS meeting.
  • Report by E. Jensen on the rates in the coordinate detector.
  • Report By L. Pentchev comparing the resolutions and rates for 5mm versus 3mm thick scintillators in the Coordinate Detector. Tex version of the report.
  • Initial sketch of frame design by Jason Sharpe.More detailed frame design by Jason Sharpe.
  • Presentation by Mahbub at the July 11th 2012 SBS meeting.
  • From Hall B, plot of widths and thickness for 3 samples over the length of the bar. Plot comparing FNAL and JLab measurements of the width and thickness of 18 bars.