(New page: 1) Reports from PIs: progress during the last month and plan for the next. 2) Discussion of the experiment item list and person responsible for each item. Below are the subsystems in HRS ...)
 
 
Line 1: Line 1:
1) Reports from PIs: progress during the last month and plan for the next.
+
Agenda:
2) Discussion of the experiment item list and person responsible for each item.
+
  
Below are the subsystems in HRS which need to be prepared:
+
1) Reports from PIs: progress during the last month and plan for the next. <br>
 
+
2) Discussion of the experiment item list and person responsible for each item.<br>
1) VDCs - need 3-4 FTE-month in electronics than 1 FTE-month for software/analysis
+
<br>
2) Shower - need 1 FTE-month in electronics than 1 FTE-month for test/analysis
+
Below are the subsystems in HRS which need to be prepared:<br>
3) S0 - need 0.5 FTE-month for installation/tests
+
<br>
4) S2m - need 1 FTE-month for electronics - high resolution TDC (in DVCS)
+
1) VDCs - need 3-4 FTE-month in electronics than 1 FTE-month for software/analysis<br>
5) Gas Cherenkov - 2-3 FTE-month for mirror test/installation, PMT tests
+
2) Shower - need 1 FTE-month in electronics than 1 FTE-month for test/analysis<br>
6) Online analysis GUI - 2-3 FTE-month
+
3) S0 - need 0.5 FTE-month for installation/tests<br>
7) HV system with units and crates - 2-3 FTE-month
+
4) S2m - need 1 FTE-month for electronics - high resolution TDC (in DVCS)<br>
8) Trigger with EDTM - 1 FTE-month
+
5) Gas Cherenkov - 2-3 FTE-month for mirror test/installation, PMT tests<br>
9) Beam information in the HRS DAQ - 1 FTE-month
+
6) Online analysis GUI - 2-3 FTE-month<br>
10) FPP chamber electronics re-installation - 3 FTE-month
+
7) HV system with units and crates - 2-3 FTE-month<br>
 +
8) Trigger with EDTM - 1 FTE-month<br>
 +
9) Beam information in the HRS DAQ - 1 FTE-month<br>
 +
10) FPP chamber electronics re-installation - 3 FTE-month<br>

Latest revision as of 17:06, 16 November 2012

Agenda:

1) Reports from PIs: progress during the last month and plan for the next.
2) Discussion of the experiment item list and person responsible for each item.

Below are the subsystems in HRS which need to be prepared:

1) VDCs - need 3-4 FTE-month in electronics than 1 FTE-month for software/analysis
2) Shower - need 1 FTE-month in electronics than 1 FTE-month for test/analysis
3) S0 - need 0.5 FTE-month for installation/tests
4) S2m - need 1 FTE-month for electronics - high resolution TDC (in DVCS)
5) Gas Cherenkov - 2-3 FTE-month for mirror test/installation, PMT tests
6) Online analysis GUI - 2-3 FTE-month
7) HV system with units and crates - 2-3 FTE-month
8) Trigger with EDTM - 1 FTE-month
9) Beam information in the HRS DAQ - 1 FTE-month
10) FPP chamber electronics re-installation - 3 FTE-month