Difference between revisions of "Thursday, February 27, 2014 2:30pm EST - Compton"

From Hall A Wiki
Jump to: navigation, search
(Minutes)
(Minutes)
Line 27: Line 27:
 
### Chuck Long (spectrometer group - Jack Segal running)
 
### Chuck Long (spectrometer group - Jack Segal running)
 
### single-pass frequency doubling only problem (expertise at the lab)
 
### single-pass frequency doubling only problem (expertise at the lab)
#### still trying to locate parts - crystal  
+
#### still trying to locate parts - crystal (several purchased)
 
#### thermoelectric chillers to control temp
 
#### thermoelectric chillers to control temp
 
#### stage still on table
 
#### stage still on table

Revision as of 15:46, 27 February 2014

Previous meeting: Tuesday, December 10, 2013 11am EST - Compton

Tentative Agenda

  1. Updates
    1. laser (Kent)
    2. DAQ (Bob/Alex)
    3. photon detector (Greg/Vahe)
    4. electron detector (Juliette/Dipangkar)
    5. magnetic field mapping (Kent)
    6. beamline status/accelerator schedule (Alex)
  2. consequences of restructuring (Dave/Thia)
  3. Next meeting time


Minutes

Attending: Juliette, Dustin, Dave, Alex, Brian, Greg, Kent

  1. Updates - Near term and long term goals, mostly near term (DVCS, PREX/CREX)
    1. laser (Kent and Dave)
      1. near term - getting running again (how it was set up before)
      2. few kW green power (easier then IR)
      3. green good for PREX
      4. work in hall (not in laser lab - 2nd floor ARC)
      5. Chuck Long (spectrometer group - Jack Segal running)
      6. single-pass frequency doubling only problem (expertise at the lab)
        1. still trying to locate parts - crystal (several purchased)
        2. thermoelectric chillers to control temp
        3. stage still on table
        4. Abdurahim - thesis - photos, etc.
      7. trying to organize after restructuring
      1. High flip rate capability of the DAQ (MOLLER)
      1. DVCS in the fall
    2. Synchrotron light at 12 GeV running



Return to Compton