Difference between revisions of "Commissioning Run Plan"
From Hall A Wiki
(New page: For the Fall of 2014 assume: <ul> <li>max 20 uA but for short times when it can go higher <li>7.3 GeV @ 4 pass, 5.5GeV @ 3 Pass and 3.7 GeV @ 2 pass. No five pass beam in the Fall of 2014...) |
|||
Line 1: | Line 1: | ||
For the Fall of 2014 assume: | For the Fall of 2014 assume: | ||
<ul> | <ul> | ||
− | <li>max 20 uA but for short times | + | <li>max 20 uA but for short times it can go higher for boiling studies and BCM calibration. |
<li>7.3 GeV @ 4 pass, 5.5GeV @ 3 Pass and 3.7 GeV @ 2 pass. No five pass beam in the Fall of 2014. | <li>7.3 GeV @ 4 pass, 5.5GeV @ 3 Pass and 3.7 GeV @ 2 pass. No five pass beam in the Fall of 2014. | ||
</ul> | </ul> | ||
== Commissioning/ Calibration == | == Commissioning/ Calibration == |
Revision as of 15:23, 6 October 2014
For the Fall of 2014 assume:
- max 20 uA but for short times it can go higher for boiling studies and BCM calibration.
- 7.3 GeV @ 4 pass, 5.5GeV @ 3 Pass and 3.7 GeV @ 2 pass. No five pass beam in the Fall of 2014.