For the Fall of 2014 assume:  
 
For the Fall of 2014 assume:  
 
<ul>
 
<ul>
<li>max 20 uA but for short times when it can go higher
+
<li>max 20 uA but for short times it can go higher for boiling studies and BCM calibration.
 
<li>7.3 GeV @ 4 pass, 5.5GeV @ 3 Pass and 3.7 GeV @ 2 pass. No five pass beam in the Fall of 2014.
 
<li>7.3 GeV @ 4 pass, 5.5GeV @ 3 Pass and 3.7 GeV @ 2 pass. No five pass beam in the Fall of 2014.
 
</ul>
 
</ul>
  
 
== Commissioning/ Calibration ==
 
== Commissioning/ Calibration ==

Revision as of 15:23, 6 October 2014

For the Fall of 2014 assume:

  • max 20 uA but for short times it can go higher for boiling studies and BCM calibration.
  • 7.3 GeV @ 4 pass, 5.5GeV @ 3 Pass and 3.7 GeV @ 2 pass. No five pass beam in the Fall of 2014.

Commissioning/ Calibration