Difference between revisions of "Commissioning Run Plan"

From Hall A Wiki
Jump to: navigation, search
(Commissioning/ Calibration)
Line 5: Line 5:
 
</ul>
 
</ul>
  
== Commissioning/ Calibration ==
+
== Commissioning and Calibrations ==

Revision as of 15:39, 6 October 2014

For the Fall of 2014 assume:

  • max 20 uA but for short times it can go higher for boiling studies and BCM calibration.
  • 7.3 GeV @ 4 pass, 5.5GeV @ 3 Pass and 3.7 GeV @ 2 pass. No five pass beam in the Fall of 2014.

Commissioning and Calibrations