Difference between revisions of "Commissioning Run Plan"
From Hall A Wiki
(→Commissioning and Calibrations) |
|||
Line 4: | Line 4: | ||
<li>7.3 GeV @ 4 pass, 5.5GeV @ 3 Pass and 3.7 GeV @ 2 pass. No five pass beam in the Fall of 2014. | <li>7.3 GeV @ 4 pass, 5.5GeV @ 3 Pass and 3.7 GeV @ 2 pass. No five pass beam in the Fall of 2014. | ||
</ul> | </ul> | ||
+ | |||
+ | == Pre-beam Checklist == | ||
== Commissioning and Calibrations == | == Commissioning and Calibrations == | ||
=== Beamline === | === Beamline === |
Revision as of 15:41, 6 October 2014
For the Fall of 2014 assume:
- max 20 uA but for short times it can go higher for boiling studies and BCM calibration.
- 7.3 GeV @ 4 pass, 5.5GeV @ 3 Pass and 3.7 GeV @ 2 pass. No five pass beam in the Fall of 2014.