Difference between revisions of "Commissioning Run Plan"
From Hall A Wiki
(→Pre-beam Checklist) |
(→Pre-beam Checklist) |
||
Line 9: | Line 9: | ||
* Checkout trigger timing | * Checkout trigger timing | ||
* Checkout of EDTM (Barak Schmookler) | * Checkout of EDTM (Barak Schmookler) | ||
− | * Think about adding 60, 100, 150, and 200 ns wide electronic deadtime scalers | + | * Think about adding 60, 100, 150, and 200 ns wide electronic deadtime scalers. |
− | + | This has been found to be a robust method for determining electronic deadtime in Hall C and we should think about adding something similar for GMP. | |
− | + | ||
− | should think about adding something similar for GMP. | + | |
== Commissioning and Calibrations == | == Commissioning and Calibrations == | ||
=== Beamline === | === Beamline === |
Revision as of 15:42, 6 October 2014
For the Fall of 2014 assume:
- max 20 uA but for short times it can go higher for boiling studies and BCM calibration.
- 7.3 GeV @ 4 pass, 5.5GeV @ 3 Pass and 3.7 GeV @ 2 pass. No five pass beam in the Fall of 2014.
Pre-beam Checklist
Trigger Checkout (Experts)
* Checkout trigger timing * Checkout of EDTM (Barak Schmookler) * Think about adding 60, 100, 150, and 200 ns wide electronic deadtime scalers. This has been found to be a robust method for determining electronic deadtime in Hall C and we should think about adding something similar for GMP.