Difference between revisions of "Wednesday, November 19: DAY Shift"

From Hall A Wiki
Jump to: navigation, search
(New page: Go back to Daily Run Plan Daily Run Plans * General considerations ** Vincent Sulkosky is the current Run Coordinator. Please contact me directly via RC phone 757-876-1787 ** Follow th...)
 
Line 11: Line 11:
 
** Make sure to use the DVCS configuration for all runs.
 
** Make sure to use the DVCS configuration for all runs.
 
** Beam studies are expected to begin at 7:00 AM.  <b>
 
** Beam studies are expected to begin at 7:00 AM.  <b>
** Hall A will be in controlled access during beam studies for the Hall A techs to work on the HRS magnets.</b>
+
** Hall A will be in controlled access during beam studies for the Hall A techs to work on the HRS magnets.<b>Anyone wanting to make an access for other reasons, should contact the RC first.</b>
 
** <b>Once this work is completed, Hall A will return to beam permit.</b>
 
** <b>Once this work is completed, Hall A will return to beam permit.</b>

Revision as of 10:56, 19 November 2014

Go back to Daily Run Plan Daily Run Plans

  • General considerations
    • Vincent Sulkosky is the current Run Coordinator. Please contact me directly via RC phone 757-876-1787
    • Follow the generic Instructions for shift takers
    • Shift leaders: Please make sure to fill out the beam time accounting form and write a "Shift Summary" log entry at the end of your shift regardless if there is beam or not.
    • In general, technical staff should not be contacted by the shift crew - please call the RC first.
  • Instructions for this shift
    • The target operator is required to supervise the cryo-target.
    • Kinematics, DVCS Kin1: Ebeam = 7.3 GeV, PLHRS=1.1981 GeV, Theta_HRS=22.83, Theta_calo=12.35
    • Make sure to use the DVCS configuration for all runs.
    • Beam studies are expected to begin at 7:00 AM.
    • Hall A will be in controlled access during beam studies for the Hall A techs to work on the HRS magnets.<b>Anyone wanting to make an access for other reasons, should contact the RC first.
    • Once this work is completed, Hall A will return to beam permit.