Difference between revisions of "Todo List"

From Hall A Wiki
Jump to: navigation, search
(NMR System)
(Laser System)
Line 9: Line 9:
 
# Optics alignment (Chiranjib/Jin/Yi'/Yi/Jian-ping)
 
# Optics alignment (Chiranjib/Jin/Yi'/Yi/Jian-ping)
 
# Camera (Jin)
 
# Camera (Jin)
# Spectrum Analyzer (Yi)
+
# Spectrum analyzer (Yi)
# Q-wave Stepping Moter (Jin)
+
# Q-wave plate stepping moter (Jin)
  
 
== Oven and Heater ==
 
== Oven and Heater ==

Revision as of 13:58, 2 October 2008

Laser System

  1. Assemble COMET Lasers (Chiranjib/Yi)
  2. Move in a Rack to new target lab for COMET Lasers
  3. Interlock connections to Lasers (Mark/Yi)
  4. Interlock connections in the Hall (Mark/Yi)
  5. RTDs for Laser enclosure (Done by Yi'/Yi)
  6. RTDs to readout chassis for interlock (Yi')
  7. Optics setup (Chiranjib/Jin)
  8. Optics alignment (Chiranjib/Jin/Yi'/Yi/Jian-ping)
  9. Camera (Jin)
  10. Spectrum analyzer (Yi)
  11. Q-wave plate stepping moter (Jin)

Oven and Heater

  1. Heater Installation (Joe)
  2. Heater Control Box and connection (Joe)
  3. Oven temperature control RTD (Yi')
  4. RTDs for He3 Cell and Reference Cell (Done by Yi'/Yi)

NMR System

  1. Longitudinal RF Coil Connection (Yi')
  2. Pickup Coil Cables (Chiranjib/Yi')
  3. VI update (Jin/Yi)
  4. NMR Lock-in repair (Yi)

EPR System

  1. EPR D2 assembly (Chiranjib/Yi)
  2. EPR RF Cable (Chiranjib/Yi')

Spin Flip

  1. Test plan (Yi/Jin)
  2. EPICS communication (Jin)
  3. VI update (Yi/Jin)

Holding Field

  1. Optimal Field determination (Yi')
  2. Correction Field Calculation (Yi')
  3. Correction Coil connection (Chiranjib/Yi')