Difference between revisions of "Wednesday, Mar. 02: SWING Shift"
From Hall A Wiki
Line 4: | Line 4: | ||
<b>Specific mission</b> | <b>Specific mission</b> | ||
− | * | + | * Note1: Production Run |
+ | * Set up the beam through Compton chicane | ||
* Detailed instructions [https://hallaweb.jlab.org/ here] | * Detailed instructions [https://hallaweb.jlab.org/ here] | ||
+ | |||
+ | <b>Upcoming event</b> | ||
+ | * Note: MCC RF recovery (8:30-11:30AM, Thursday) | ||
+ | Access Wish List:(controlled access) | ||
+ | 1/ Series of magnet measurement <: 30min/ no beam/ but beam permit | ||
+ | 2/ Andrew Lumanog (327-5523) : <1hr | ||
+ | 3/ Compton : check laser profile : <1hr | ||
+ | |||
+ | |||
+ | * Detailed Plan [https://hallaweb.jlab.org/ here] | ||
Revision as of 13:30, 2 March 2016
Go back to Daily Run Plan Daily Run Plans
- General considerations
Specific mission
- Note1: Production Run
- Set up the beam through Compton chicane
- Detailed instructions here
Upcoming event
- Note: MCC RF recovery (8:30-11:30AM, Thursday)
Access Wish List:(controlled access) 1/ Series of magnet measurement <: 30min/ no beam/ but beam permit 2/ Andrew Lumanog (327-5523) : <1hr 3/ Compton : check laser profile : <1hr
- Detailed Plan here
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carborn hole target and make sure you can see the hole through Spot++