Difference between revisions of "Wednesday, Mar. 02: SWING Shift"
From Hall A Wiki
Line 1: | Line 1: | ||
Go back to Daily Run Plan [[Daily Run Plans]] | Go back to Daily Run Plan [[Daily Run Plans]] | ||
* General considerations | * General considerations | ||
− | * | + | * BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG |
<b>Specific mission</b> | <b>Specific mission</b> | ||
− | * | + | * <b>Production Run</b> |
* Set up the beam through Compton chicane | * Set up the beam through Compton chicane | ||
Revision as of 13:33, 2 March 2016
Go back to Daily Run Plan Daily Run Plans
- General considerations
- BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG
Specific mission
- Production Run
- Set up the beam through Compton chicane
- Detailed instructions here
Upcoming event
- Note: MCC RF recovery (8:30-11:30AM, Thursday)
Access Wish List:(controlled access) 1/ Series of magnet measurement <: 30min/ no beam/ but beam permit 2/ Andrew Lumanog (327-5523) : <1hr 3/ Compton : check laser profile : <1hr
- Detailed Plan here
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carborn hole target and make sure you can see the hole through Spot++