Difference between revisions of "Wednesday, Mar. 02: SWING Shift"

From Hall A Wiki
Jump to: navigation, search
Line 1: Line 1:
 
Go back to Daily Run Plan [[Daily Run Plans]]
 
Go back to Daily Run Plan [[Daily Run Plans]]
 
* General considerations
 
* General considerations
**
+
* BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG
  
 
<b>Specific mission</b>
 
<b>Specific mission</b>
* Note1: Production Run
+
* <b>Production Run</b>
 
* Set up the beam through Compton chicane
 
* Set up the beam through Compton chicane
  

Revision as of 13:33, 2 March 2016

Go back to Daily Run Plan Daily Run Plans

  • General considerations
  • BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG

Specific mission

  • Production Run
  • Set up the beam through Compton chicane
  • Detailed instructions here

Upcoming event

  • Note: MCC RF recovery (8:30-11:30AM, Thursday)

Access Wish List:(controlled access) 1/ Series of magnet measurement <: 30min/ no beam/ but beam permit 2/ Andrew Lumanog (327-5523) : <1hr 3/ Compton : check laser profile : <1hr



BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carborn hole target and make sure you can see the hole through Spot++