Difference between revisions of "Wednesday, Mar. 02: SWING Shift"

From Hall A Wiki
Jump to: navigation, search
Line 2: Line 2:
 
* General considerations
 
* General considerations
 
* BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG
 
* BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG
 +
* Need shift crews for future
  
 
<b>Specific mission</b>
 
<b>Specific mission</b>
Line 7: Line 8:
 
* Set up the beam through Compton chicane
 
* Set up the beam through Compton chicane
  
* Detailed instructions [https://hallaweb.jlab.org/ here]
+
<b>Upcoming event(Short Term)</b>
 
+
<b>Upcoming event</b>
+
 
* Note: MCC RF recovery (8:30-11:30AM, Thursday)
 
* Note: MCC RF recovery (8:30-11:30AM, Thursday)
 
Access Wish List:(controlled access)
 
Access Wish List:(controlled access)
Line 15: Line 14:
 
2/ Andrew Lumanog (327-5523) : <1hr
 
2/ Andrew Lumanog (327-5523) : <1hr
 
3/ Compton : check laser profile : <1hr
 
3/ Compton : check laser profile : <1hr
 
  
 
* Detailed Plan [https://hallaweb.jlab.org/ here]
 
* Detailed Plan [https://hallaweb.jlab.org/ here]
 +
 +
b>Upcoming event(Long Term)</b>
 +
* BCM calibration (high beam current 30uA(60 ideal),FC, invasive Hall-D(deal with them, possible Monday ??))
 +
* Target boiling test 30uA(60 ideal)
 +
 +
* Detailed instructions
 +
BCM [http://hallaweb.jlab.org/equipment/BCM/HallA_BCM_linearity.pdf DOC1][http://hallaweb.jlab.org/equipment/BCM/HallA_Unser_0L02_cal.pdf DOC2]
 +
  
  

Revision as of 13:38, 2 March 2016

Go back to Daily Run Plan Daily Run Plans

  • General considerations
  • BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG
  • Need shift crews for future

Specific mission

  • Production Run
  • Set up the beam through Compton chicane

Upcoming event(Short Term)

  • Note: MCC RF recovery (8:30-11:30AM, Thursday)

Access Wish List:(controlled access) 1/ Series of magnet measurement <: 30min/ no beam/ but beam permit 2/ Andrew Lumanog (327-5523) : <1hr 3/ Compton : check laser profile : <1hr

b>Upcoming event(Long Term)</b>

  • BCM calibration (high beam current 30uA(60 ideal),FC, invasive Hall-D(deal with them, possible Monday ??))
  • Target boiling test 30uA(60 ideal)
  • Detailed instructions

BCM DOC1DOC2


BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carborn hole target and make sure you can see the hole through Spot++