Difference between revisions of "Wednesday, Mar. 02: SWING Shift"
From Hall A Wiki
Line 2: | Line 2: | ||
* General considerations | * General considerations | ||
* BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG | * BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG | ||
+ | * Need shift crews for future | ||
<b>Specific mission</b> | <b>Specific mission</b> | ||
Line 7: | Line 8: | ||
* Set up the beam through Compton chicane | * Set up the beam through Compton chicane | ||
− | + | <b>Upcoming event(Short Term)</b> | |
− | + | ||
− | <b>Upcoming event</b> | + | |
* Note: MCC RF recovery (8:30-11:30AM, Thursday) | * Note: MCC RF recovery (8:30-11:30AM, Thursday) | ||
Access Wish List:(controlled access) | Access Wish List:(controlled access) | ||
Line 15: | Line 14: | ||
2/ Andrew Lumanog (327-5523) : <1hr | 2/ Andrew Lumanog (327-5523) : <1hr | ||
3/ Compton : check laser profile : <1hr | 3/ Compton : check laser profile : <1hr | ||
− | |||
* Detailed Plan [https://hallaweb.jlab.org/ here] | * Detailed Plan [https://hallaweb.jlab.org/ here] | ||
+ | |||
+ | b>Upcoming event(Long Term)</b> | ||
+ | * BCM calibration (high beam current 30uA(60 ideal),FC, invasive Hall-D(deal with them, possible Monday ??)) | ||
+ | * Target boiling test 30uA(60 ideal) | ||
+ | |||
+ | * Detailed instructions | ||
+ | BCM [http://hallaweb.jlab.org/equipment/BCM/HallA_BCM_linearity.pdf DOC1][http://hallaweb.jlab.org/equipment/BCM/HallA_Unser_0L02_cal.pdf DOC2] | ||
+ | |||
Revision as of 13:38, 2 March 2016
Go back to Daily Run Plan Daily Run Plans
- General considerations
- BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG
- Need shift crews for future
Specific mission
- Production Run
- Set up the beam through Compton chicane
Upcoming event(Short Term)
- Note: MCC RF recovery (8:30-11:30AM, Thursday)
Access Wish List:(controlled access) 1/ Series of magnet measurement <: 30min/ no beam/ but beam permit 2/ Andrew Lumanog (327-5523) : <1hr 3/ Compton : check laser profile : <1hr
- Detailed Plan here
b>Upcoming event(Long Term)</b>
- BCM calibration (high beam current 30uA(60 ideal),FC, invasive Hall-D(deal with them, possible Monday ??))
- Target boiling test 30uA(60 ideal)
- Detailed instructions
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carborn hole target and make sure you can see the hole through Spot++