Difference between revisions of "Thursday, Mar. 03: DAY Shift"
From Hall A Wiki
Line 4: | Line 4: | ||
<b>Specific mission</b> | <b>Specific mission</b> | ||
− | * Note: | + | * Note: MCC RF recovery (8:30-11:30AM) Down time<br> |
+ | 1/ Doug: Series of magnet measurement <: 1hr / no beam/ but beam permit<br> | ||
+ | No controlled access<br> | ||
+ | Once RF recovery is done, <br> | ||
+ | 2/ BCM calibration (high beam current 30uA(60 ideal) with FC & empty target<br> | ||
+ | - Calo. HV off<br> | ||
+ | 3/ Set up beam through Compton chicane<br> | ||
+ | 4/ Production Data with stable beam current<br> | ||
+ | |||
* Detailed instructions [https://hallaweb.jlab.org/ here] | * Detailed instructions [https://hallaweb.jlab.org/ here] |
Revision as of 09:46, 3 March 2016
Go back to Daily Run Plan Daily Run Plans
- General considerations
Specific mission
- Note: MCC RF recovery (8:30-11:30AM) Down time
1/ Doug: Series of magnet measurement <: 1hr / no beam/ but beam permit
No controlled access
Once RF recovery is done,
2/ BCM calibration (high beam current 30uA(60 ideal) with FC & empty target
- Calo. HV off
3/ Set up beam through Compton chicane
4/ Production Data with stable beam current
- Detailed instructions here
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++