Difference between revisions of "Thursday, Mar. 03: DAY Shift"
From Hall A Wiki
Line 6: | Line 6: | ||
* Note: MCC RF recovery (8:30-11:30AM) Down time<br> | * Note: MCC RF recovery (8:30-11:30AM) Down time<br> | ||
1/ Doug: Series of magnet measurement <: 1hr / no beam/ but beam permit<br> | 1/ Doug: Series of magnet measurement <: 1hr / no beam/ but beam permit<br> | ||
− | No controlled access<br> | + | - <b>No controlled access !</b><br> |
Once RF recovery is done, <br> | Once RF recovery is done, <br> | ||
2/ BCM calibration (high beam current 30uA(60 ideal) with FC & empty target<br> | 2/ BCM calibration (high beam current 30uA(60 ideal) with FC & empty target<br> |
Revision as of 09:47, 3 March 2016
Go back to Daily Run Plan Daily Run Plans
- General considerations
Specific mission
- Note: MCC RF recovery (8:30-11:30AM) Down time
1/ Doug: Series of magnet measurement <: 1hr / no beam/ but beam permit
- No controlled access !
Once RF recovery is done,
2/ BCM calibration (high beam current 30uA(60 ideal) with FC & empty target
- Calo. HV off
3/ Set up beam through Compton chicane
4/ Production Data with stable beam current
- Detailed instructions here
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++