Difference between revisions of "Friday, Mar. 04: OWL Shift"

From Hall A Wiki
Jump to: navigation, search
(New page: Go back to Daily Run Plan Daily Run Plans <b>Previously...</b> * Set up beam through Compton chicane <b>Specific mission</b> * Note: 1/ Set up beam through Compton chicane<br> -...)
 
Line 19: Line 19:
 
[http://hallaweb.jlab.org/equipment/BCM/HallA_BCM_linearity.pdf DOC1][http://hallaweb.jlab.org/equipment/BCM/HallA_Unser_0L02_cal.pdf DOC2]
 
[http://hallaweb.jlab.org/equipment/BCM/HallA_BCM_linearity.pdf DOC1][http://hallaweb.jlab.org/equipment/BCM/HallA_Unser_0L02_cal.pdf DOC2]
 
<br>
 
<br>
- Experts on call (Dave/Julie/Thir/...)
+
- Experts on call (Dave/Julie/Thir/...)<br>
- Calo. HV off<br>
+
- Calo. HV off<br>
  
  

Revision as of 21:56, 3 March 2016

Go back to Daily Run Plan Daily Run Plans


Previously...

  • Set up beam through Compton chicane


Specific mission

  • Note:

1/ Set up beam through Compton chicane

- Ciprian, Greg and Yves  are tuning the beam through Compton

2/ Expect some production runs through Compton

3/ Agreement with Hall-D and Talked PD to set up the BCM calibration tomorrow

- Crucial: high beam current 30uA with FC & empty target 

Instruction: DOC1DOC2

- Experts on call (Dave/Julie/Thir/...)
- Calo. HV off



BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++