Difference between revisions of "Friday, Mar. 04: SWING Shift"

From Hall A Wiki
Jump to: navigation, search
(New page: Go back to Daily Run Plan Daily Run Plans <b>Previously...</b> * BCM calibration ( ) <b>Specific mission</b> * Note: 1/ Back to production mode <b>Weekend Plan</b> * Note: 1/ P...)
 
Line 12: Line 12:
 
* Note:
 
* Note:
 
1/ Back to production mode
 
1/ Back to production mode
 +
 +
 +
 +
  
 
<b>Weekend Plan</b>
 
<b>Weekend Plan</b>

Revision as of 09:55, 4 March 2016

Go back to Daily Run Plan Daily Run Plans


Previously...

  • BCM calibration ( )



Specific mission

  • Note:

1/ Back to production mode



Weekend Plan

  • Note:

1/ Production data


BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++