Difference between revisions of "Friday, Mar. 04: DAY Shift"
From Hall A Wiki
Line 16: | Line 16: | ||
- Experts on call (Julie)<br> | - Experts on call (Julie)<br> | ||
- Calo. HV off<br> | - Calo. HV off<br> | ||
− | 10:50AM (snap shot of BCM) | + | 10:50AM (snap shot of BCM)<br> |
− | [[Image:BCM_snapshot_03042016_1050am.png| | + | [[Image:BCM_snapshot_03042016_1050am.png|300px|Image: hac_bcm_average]] |
Instruction: | Instruction: |
Revision as of 11:59, 4 March 2016
Go back to Daily Run Plan Daily Run Plans
Previously...
- Set up beam through Compton chicane
- Production runs (YES!!)
Specific mission
- Note:
1/ Agreement with Hall-D and Talked PD to set up the BCM calibration (8:30AM)
- Crucial: high beam current 30uA(at least try) with FC & empty target
- Experts on call (Julie)
- Calo. HV off
2/ Back to production mode
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++