Difference between revisions of "Friday, Mar. 04: DAY Shift"

From Hall A Wiki
Jump to: navigation, search
Line 20: Line 20:
  
 
10:50AM (snap shot of BCM)<br>
 
10:50AM (snap shot of BCM)<br>
[[Image:BCM_snapshot_03042016_1050am.png|300px|Image: hac_bcm_average]]
+
[[Image:BCM_snapshot_03042016_1050am.png|300px|Image: hac_bcm_average]]<br>
 
11:00AM Complete mission of BCM<br>
 
11:00AM Complete mission of BCM<br>
 
HALOG:[]<br>
 
HALOG:[]<br>

Revision as of 12:12, 4 March 2016

Go back to Daily Run Plan Daily Run Plans


Previously...

  • Set up beam through Compton chicane
  • Production runs (YES!!)



Specific mission

  • Note:

1/ Agreement with Hall-D and Talked PD to set up the BCM calibration (8:30AM)

- Crucial: high beam current 30uA(at least try) with FC & empty target 
- Experts on call (Julie)
- Calo. HV off
- Instruction: DOC1DOC2

10:50AM (snap shot of BCM)
Image: hac_bcm_average
11:00AM Complete mission of BCM
HALOG:[]

2/ Back to production mode


BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++