Difference between revisions of "Friday, Mar. 04: SWING Shift"

From Hall A Wiki
Jump to: navigation, search
Line 20: Line 20:
 
* Note:
 
* Note:
 
1/ Production data
 
1/ Production data
 +
- 15uA through Compton chicane<br>
 +
- LH2 target<br>
 +
- DVCS ON<br>
 +
- LHRS=2.92GeV, Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)<br>
 +
- PreScaleR : PS1=PS2=PS3=1, && PS8=200<br>
 +
- PreScaleL : PS9 =1, + DVCS config.
 +
 +
  
  

Revision as of 12:42, 4 March 2016

Go back to Daily Run Plan Daily Run Plans


Previously...

  • BCM calibration ( YES !!)



Specific mission

  • Note:

1/ Back to production mode



Weekend Plan

  • Note:

1/ Production data

- 15uA through Compton chicane
- LH2 target
- DVCS ON
- LHRS=2.92GeV, Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)
- PreScaleR : PS1=PS2=PS3=1, && PS8=200
- PreScaleL : PS9 =1, + DVCS config.



BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++