Difference between revisions of "Friday, Mar. 04: DAY Shift"
From Hall A Wiki
Line 16: | Line 16: | ||
- Experts on call (Julie)<br> | - Experts on call (Julie)<br> | ||
- Calo. HV off<br> | - Calo. HV off<br> | ||
− | - Instruction: [http://hallaweb.jlab.org/equipment/BCM/HallA_BCM_linearity.pdf DOC1][http://hallaweb.jlab.org/equipment/BCM/HallA_Unser_0L02_cal.pdf DOC2] | + | - Instruction: [http://hallaweb.jlab.org/equipment/BCM/HallA_BCM_linearity.pdf DOC1], [http://hallaweb.jlab.org/equipment/BCM/HallA_Unser_0L02_cal.pdf DOC2] |
10:50AM (snap shot of BCM)<br> | 10:50AM (snap shot of BCM)<br> |
Revision as of 12:50, 4 March 2016
Go back to Daily Run Plan Daily Run Plans
Previously...
- Set up beam through Compton chicane
- Production runs (YES!!)
Specific mission
- Note:
1/ Agreement with Hall-D and Talked PD to set up the BCM calibration (8:30AM)
- Crucial: high beam current 30uA(at least try) with FC & empty target
- Experts on call (Julie)
- Calo. HV off
- Instruction: DOC1, DOC2
10:50AM (snap shot of BCM)
11:00AM Complete mission of BCM
HALOG:[1], [2]
2/ Back to production mode (11:30AM)
- 15uA through Compton chicane
- LH2 target
- DVCS ON
- LHRS=2.92GeV, Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)
- PreScaleR : PS1=PS2=PS3=1, && PS8=200
- PreScaleL : PS9 =1, + DVCS config.
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++