(Minutes)
(Minutes)
Line 33: Line 33:
  
  
Attending:   
+
Attending:  Juliette, KK, Seamus, Cameron, Tyler, Rakitha, Jim
 
+
* Juliette, KK, Seamus, Cameron, Tyler, Rakitha
+
  
 
* Cameron's slides  
 
* Cameron's slides  
Line 45: Line 43:
 
*** "fix" detector locations
 
*** "fix" detector locations
 
* shielding def'n into CAD
 
* shielding def'n into CAD
 
+
** Rakitha will make sure repository updated
 +
** Seamus and Tyler will work to import into CAD
  
  
 
<br><br> Return to [[Teleconferences]]
 
<br><br> Return to [[Teleconferences]]
 
<br> Return to [[MOLLER at 11 GeV E09-005]]
 
<br> Return to [[MOLLER at 11 GeV E09-005]]

Revision as of 13:45, 8 June 2016

Last meeting: Thursday, April 14, 2016 11:00am EST


Agenda



  • Javier's Pre-project Planning document, due soon (A-C3)

List of major subsystems
List of subsystems of each major system
Persons responsible for each subsystem
Schematic/list of subsystem cartoon
Estimate cost as well as possible (cite source: manufacturer, previous purchases, machine shop work, catalog, etc.) January 2016 Table
Labor estimate Labor

Packaging and shipping costs and timeline
Work timeline
Time for funds to come in
Procurement times

  • Javier's Pre-project Planning document (C6 - L2 manager compiles information)

Procurement Profile
Labor Profile
Timeline for contracts, hiring, funds transfers
Cost and Risk

Cameron's MOLLER CAD to-do list



Minutes

Attending: Juliette, KK, Seamus, Cameron, Tyler, Rakitha, Jim

  • Cameron's slides
    • PMT shield
    • moveable collimator
      • between inner photon collimator and acceptance defining colimator
      • concrete shield is downstream
      • update e- and gamma envelopes
      • "fix" detector locations
  • shielding def'n into CAD
    • Rakitha will make sure repository updated
    • Seamus and Tyler will work to import into CAD