Difference between revisions of "Thursday, August 23, 2018, 10:00 am EDT - Compton"
From Hall A Wiki
Line 37: | Line 37: | ||
Attending: | Attending: | ||
− | + | Kent P, Adam Z, Amali P, Ciprian G, Brian Q, Juan Carlos C, | |
Excused: | Excused: | ||
+ | Dave G, | ||
==== Laser status: ==== | ==== Laser status: ==== | ||
− | + | * KP: want to have a better understanding of the laser setup. AP: will work on it until next time | |
==== DAQ:==== | ==== DAQ:==== | ||
+ | * JC: no updates on the DAQ. Jinlong and JC will be in the hall Th to Sun (Aug 30th to Sept 2nd) | ||
+ | * Plans are being worked on for linearly tests | ||
==== Electron Detector: ==== | ==== Electron Detector: ==== | ||
==== Simulation: ==== | ==== Simulation: ==== | ||
+ | * AP: comparison between the GSO (build from scratch - 3 cm radius) and PbWO4 geometries. | ||
+ | * KP: slide 3: why do the PbWO4 low energy photons deposit little energy? AP: will rerun with larger apertures (jaws and collimator). This was run with 6 mm distance between jaws | ||
+ | * AP: the GSO on slide 4 is at 3.4 GeV, while the PbWO4 is at 10.6 GeV. The Compton paper ran the simulation at this value. KP: PREX is at 0.95 so we should have that in our set of plots | ||
+ | * JCC: will send out optical properties for GSO to Amali. KP: we should document what these parameters are once AP gets them. | ||
+ | * JCC: the 10mm sync shield is a bit too thick, you should reduce it to 1mm. AP: will do |
Latest revision as of 14:46, 23 August 2018
Back to Main Compton Page >> Compton Meetings >> Previous Meeting
*********BLUEJEANS CALL-IN INSTRUCTIONS********* ---------------------------------------------------- 1. Dial Toll-Free Number: 1-888-240-2560 (U.S. & Canada) 2. International participants dial: Toll Number: 1-408-740-7256 3. Enter meeting ID:140287970 Desktop sharing: https://bluejeans.com/140287970
Contents
Agenda
Meeting room= F224-225 in Cebaf Center 2nd floor Counting House meeting room
General
- Hall lockup is 9/12. Need to get stuff out of hall by 9/7
Laser
- Mode-match/locking update [1]
- Polarization optimization update
Photon Detector
- DAQ work
- PMT/linearity update
Electron detector
- EEL test-stand update
- Manitoba update
Simulation
- Photon detector G4 update
Minutes
Attending: Kent P, Adam Z, Amali P, Ciprian G, Brian Q, Juan Carlos C, Excused: Dave G,
Laser status:
- KP: want to have a better understanding of the laser setup. AP: will work on it until next time
DAQ:
- JC: no updates on the DAQ. Jinlong and JC will be in the hall Th to Sun (Aug 30th to Sept 2nd)
- Plans are being worked on for linearly tests
Electron Detector:
Simulation:
- AP: comparison between the GSO (build from scratch - 3 cm radius) and PbWO4 geometries.
- KP: slide 3: why do the PbWO4 low energy photons deposit little energy? AP: will rerun with larger apertures (jaws and collimator). This was run with 6 mm distance between jaws
- AP: the GSO on slide 4 is at 3.4 GeV, while the PbWO4 is at 10.6 GeV. The Compton paper ran the simulation at this value. KP: PREX is at 0.95 so we should have that in our set of plots
- JCC: will send out optical properties for GSO to Amali. KP: we should document what these parameters are once AP gets them.
- JCC: the 10mm sync shield is a bit too thick, you should reduce it to 1mm. AP: will do