Difference between revisions of "Transversity Target Calibration List"
From Hall A Wiki
(→EPR Calibration) |
|||
Line 1: | Line 1: | ||
− | This is a collection | + | This is a collection of [[he3]] target calibration measurement for experiment [[transversity]] |
+ | Please add an entry for each furture calibration. Please include | ||
+ | * Time stamp as second order title | ||
+ | * the data directory | ||
+ | * Result if there is any | ||
+ | * measurement condition | ||
+ | * Link to Halog Entry | ||
+ | * Recormend to include the measurement time line | ||
+ | |||
= EPR Calibration = | = EPR Calibration = | ||
Line 50: | Line 58: | ||
01:13 Temp Stable to | 01:13 Temp Stable to | ||
RTD#0->6=64c 130c 167c 105c 52c 224C 221C | RTD#0->6=64c 130c 167c 105c 52c 224C 221C | ||
− | 01:14 Field NMR | + | 01:14 Field NMR |
-> Pol=~56% (calib const changes when he3 temperature changes) | -> Pol=~56% (calib const changes when he3 temperature changes) | ||
01:15 Target -> He3 | 01:15 Target -> He3 |
Revision as of 18:02, 14 November 2008
This is a collection of he3 target calibration measurement for experiment transversity
Please add an entry for each furture calibration. Please include
- Time stamp as second order title
- the data directory
- Result if there is any
- measurement condition
- Link to Halog Entry
- Recormend to include the measurement time line
Contents
EPR Calibration
Nov 13
Water Calibration
Internal Temp. Calibration
NMR Cross Calibration
Nov 14, 2008
Please Ref to Halog #248715.
Please check the data according the the NMR time stamp below.
Event Time Line
Start Point: Pick up Coil Pos Trans - Holding Field Spin Antiparallel to Field Pol.=~60% 11:06 NMR Freq Sweep -> Pol = ~60% (42mV) RTD#0->6=67C 133C 167C 106C 52C 223C 221C 11:20 Bigbite ->710A 11:51 Pumping Laser Off From now on there is no good NMR pol first guess since cell temperature changes 12:33 Temp Stable to Oven=330C Coil=-4.601A,6.232A,0.712A RTD#0->6=66C 134C 167C 107C 53C 224C 221C 12:40 Target -> He3 12:43 Freq NMR @ He3 -> Pol=~60% (40mV), Peak @ 81kHz 12:53 Temp Stable to Oven=330C Coil=-4.599A,6.230A,0.712A RTD#0->6=40C 71C 140C 61C 38C 223C 220C -------------------------------------------------------- NMR Cross Calibration Start -------------------------------------------------------- 12:54 Freq NMR @ He3 -> Pol=50-60% 33mV 01:00 Field -> Long + 01:02 Target -> Pick Coil 01:13 Temp Stable to RTD#0->6=64c 130c 167c 105c 52c 224C 221C 01:14 Field NMR -> Pol=~56% (calib const changes when he3 temperature changes) 01:15 Target -> He3 01:27 Temp Stable to RTD#0->6=40C 71C 137C 62C 38C 223C 221C 01:27 Freq NMR @ He3 -> Pol=50-60% (31mV) -------------------------------------------------------- NMR Cross Calibration Ends -------------------------------------------------------- 01:50 Temperature change screen shot 02:06 NMR Field Sweep. Pol.=~40~50%