Difference between revisions of "May 13, 2018"
From Hall A Wiki
(Created page with "Back to Main Page >> Moller Page >> Moller Weekly Meeting Index previous meeting << >> May_20%2C_20...") |
|||
Line 34: | Line 34: | ||
Minutes | Minutes | ||
---- | ---- | ||
+ | Simona: | ||
+ | *Copper target successfully installed by D. Meekins. | ||
+ | *Target motion mechanism change made and tested for two hours. Encoder and stepper motor position now agree. | ||
+ | *Target ladder surveyed with respect to vacuum flange, then installed and resurveyed with respect to magnet. | ||
+ | *PMT's arrived. Expect to test them this week and install soon. | ||
+ | *Scintillator paddles have been added to ADC readouts. Gates added for scintillator signals. | ||
+ | *Roman is working on line by line conversion of Fortran analyzer to C++. Yay! | ||
+ | |||
+ | Eric away. |
Latest revision as of 09:41, 16 May 2019
Back to Main Page >> Moller Page >> Moller Weekly Meeting Index
previous meeting << >> following meeting
Original Moller Polarimeter Page
Agenda:
- Onsite update -- Simona/Roman/Sanghwa
- Simulation update -- Eric
Connection details:
Meeting URL https://bluejeans.com/388466836
Meeting ID 388 466 836
US toll free phone 1.888.240.2560
Dial in, type in the meeting ID and then press ##
Minutes
Simona:
- Copper target successfully installed by D. Meekins.
- Target motion mechanism change made and tested for two hours. Encoder and stepper motor position now agree.
- Target ladder surveyed with respect to vacuum flange, then installed and resurveyed with respect to magnet.
- PMT's arrived. Expect to test them this week and install soon.
- Scintillator paddles have been added to ADC readouts. Gates added for scintillator signals.
- Roman is working on line by line conversion of Fortran analyzer to C++. Yay!
Eric away.