Line 6: Line 6:
 
***HCal move prep slides: [[Media:HCal_Move_Preparations-compressed.pdf‎| pdf]]
 
***HCal move prep slides: [[Media:HCal_Move_Preparations-compressed.pdf‎| pdf]]
 
**BB Shower
 
**BB Shower
 +
***will start decabling on Monday
 +
***FADC with a bad channel - move to another channel - block working ok
 +
***Mark working on the F1 - not sure if he has right library - Bryan will have a quick look at setup
 
**BB Hodoscope
 
**BB Hodoscope
 +
***still taking data
 +
***waiting next week to start decabling
 +
***
 
**GRINCH
 
**GRINCH
 
**LHRS
 
**LHRS
 +
***progress on cabling and looking at histogram
 +
***talk on Monday for HRS status at main meeting
 +
***bank numbering - same bank - max bank number -use same as Hall C - will make a table for the modules will put same bank number as module
 
**GEM INFN
 
**GEM INFN
 +
***INFN and UVA GEM in TEDF took cosmics
 +
***issue with DAQ - problem with HV on one INFN -killed one APV
 +
***Sean did studies of common mode processing : looks same with sorting and Danning algorithm
 +
***working on shielding of GEM before move
 +
***other UVA for front tracking coming next week UV chambers
 
**GEM UVA : working on shielding of chambers
 
**GEM UVA : working on shielding of chambers
 +
**HV
 +
***EPICS controls working for MPOD wiener HV for UVA GEM
 +
***INFN GEM has different HV - ordering more MPOD to have one single
 +
***software : installation - adaqsc - slowc account  - same password as adaq or a-onl
 +
*** need update updates start / end run scripts to use new HV - and epicslogger
 +
***cannot ssh in rpi8 on LHRS ? might need to restart it or be on right subnet -Bob will send instructions to Steve
 +
**Data moving
 +
***Bob agreed to help set it up
 +
  
 
*Move to Hall A
 
*Move to Hall A
 
**weldment status
 
**weldment status
 +
***still no answer from Jessie or Jack, but plan to be as close as possible to bunker - if cannot move in - will move racks
 +
***need to make sure nothing loose on weldment so they don't fall
 
**hostnames to be transferred
 
**hostnames to be transferred
 +
***as soon as decabling start will ask to move Bigbite host to 192 subnet
 
**transfer software to counting house
 
**transfer software to counting house
 +
***SBS-online status ? Most detector using SBS-online, maybe Grinch still working
 +
***ET system for online ?
 +
*** people will install software while detector down
 +
*Network : fibers started installation this , put new router next week

Revision as of 11:39, 14 May 2021

  • Updates
    • HCAL
      • work on decabling / move
      • tried DVCS pulser but need to go through regular gate generator
      • move to May 24th
      • HCal move prep slides: pdf
    • BB Shower
      • will start decabling on Monday
      • FADC with a bad channel - move to another channel - block working ok
      • Mark working on the F1 - not sure if he has right library - Bryan will have a quick look at setup
    • BB Hodoscope
      • still taking data
      • waiting next week to start decabling
    • GRINCH
    • LHRS
      • progress on cabling and looking at histogram
      • talk on Monday for HRS status at main meeting
      • bank numbering - same bank - max bank number -use same as Hall C - will make a table for the modules will put same bank number as module
    • GEM INFN
      • INFN and UVA GEM in TEDF took cosmics
      • issue with DAQ - problem with HV on one INFN -killed one APV
      • Sean did studies of common mode processing : looks same with sorting and Danning algorithm
      • working on shielding of GEM before move
      • other UVA for front tracking coming next week UV chambers
    • GEM UVA : working on shielding of chambers
    • HV
      • EPICS controls working for MPOD wiener HV for UVA GEM
      • INFN GEM has different HV - ordering more MPOD to have one single
      • software : installation - adaqsc - slowc account - same password as adaq or a-onl
      • need update updates start / end run scripts to use new HV - and epicslogger
      • cannot ssh in rpi8 on LHRS ? might need to restart it or be on right subnet -Bob will send instructions to Steve
    • Data moving
      • Bob agreed to help set it up


  • Move to Hall A
    • weldment status
      • still no answer from Jessie or Jack, but plan to be as close as possible to bunker - if cannot move in - will move racks
      • need to make sure nothing loose on weldment so they don't fall
    • hostnames to be transferred
      • as soon as decabling start will ask to move Bigbite host to 192 subnet
    • transfer software to counting house
      • SBS-online status ? Most detector using SBS-online, maybe Grinch still working
      • ET system for online ?
      • people will install software while detector down
  • Network : fibers started installation this , put new router next week