Difference between revisions of "August 13th 2021"

From Hall A Wiki
Jump to: navigation, search
Line 1: Line 1:
 
*Updates
 
*Updates
 
**HCal
 
**HCal
***
+
***HCal fully cabled
 +
***starting reestablishing DAQ, can log to ROC
 +
***will work today on HV (rpi20 and 21)
 +
*** and try to take data
 +
*** summing trigger should be working, need to adjust for delays with different PMTs
 
**Bigbite Shower
 
**Bigbite Shower
 +
***Eric, Provokar
 +
***need plug in 15 more bundles
 +
***need plug scalers ( NIM/ECL converter to scaler and F1 TDC)
 +
*** set up cosmics
 +
*** need cable for BigBite shower thresholds
 +
*** will finish cabling this week, start turning on next week
 +
*** check mapping
 +
*** Bryan configuring all detectors today - think to finish today
 
**Bigbite Hodoscope
 
**Bigbite Hodoscope
 +
***all ADC and TDC cabled at detector frame and signal going to bunker, all cables reach in bunker - TDC cables a bit sho
 
**GRINCH
 
**GRINCH
 
**LHRS
 
**LHRS

Revision as of 10:41, 13 August 2021

  • Updates
    • HCal
      • HCal fully cabled
      • starting reestablishing DAQ, can log to ROC
      • will work today on HV (rpi20 and 21)
      • and try to take data
      • summing trigger should be working, need to adjust for delays with different PMTs
    • Bigbite Shower
      • Eric, Provokar
      • need plug in 15 more bundles
      • need plug scalers ( NIM/ECL converter to scaler and F1 TDC)
      • set up cosmics
      • need cable for BigBite shower thresholds
      • will finish cabling this week, start turning on next week
      • check mapping
      • Bryan configuring all detectors today - think to finish today
    • Bigbite Hodoscope
      • all ADC and TDC cabled at detector frame and signal going to bunker, all cables reach in bunker - TDC cables a bit sho
    • GRINCH
    • LHRS
    • CDet
    • GEM BB Hall A
    • GEM INFN Test Lab
    • RF time
    • HV
      • HV GUI for the GEM people.
    • Scalers
      • Also I got the DSC modules to work as scalers and I am setting up a bunch of SIS scalers as 3800s. I also have 4 G0 scalers that we could use, but we should make sure that they have wide input signals (>10 ns) and that we don’t use them for anything critical like deadtime, efficiency, beam current etc.
    • Recoil polarimeter
  • On-going tasks
    • Network setup ( done ) - SBS MPD side might need few cables - need pull network for SBS side (0%)
    • Scaler crate setup (50 % - Steve ) - need fix supply
    • documentation of VME crate names to power cycle
    • 3 rd GEM VXS crate install router moved up ( 50% )
    • need power and network in GEM bunker ( done )
    • boot VME controllers (90 % done - need ask hostname TS crate )
    • TS cables - all fibers plugged - will post informations -hodoscope / grinch/ shower separate - can be combined at any time now everything plugged to TS
    • detector cabling
    • new MPD production - about to start - FPGA shipped to Paolo
    • MPD VTP readout - on-going in daq lab - still having issue getting APV sending data to MPD - events going through high speed link
    • MPD being setup in Hall A - need setup VTPs to boot (done ) - 10 gigE network plugged (done) - will be able to test in Hall A - LV installed soon (done )
    • setup portservers : 1 4 port portserver for VTP (done), still need to set up a 8 port one and HCAL portserver
    • need to install remote switch for crate in bunker - rest are VXS or VME64 -
    • Bigbite - HCal trigger setup - need check with Bob if additionnal NIM crate need to be install
    • TS setup - 50 %
    • Beamline crate setup ( in scaler crate ) - FADC is in scaler need to be setup - need pull raster BPM BCM (0% will do it with David )
    • HCAL cabling
    • HCAL need power ( done, Berta )
    • Mark hodoscope trigger ?
    • Computer move to Hall A : sbsdaq1/2 tedbbdaq (done ) enpcamsonne ( done )
    • LHRS fiber pull ( waiting fiber August 13th ) - most likely LHRS at end of SBS run
    • Cosmics trigger ( Bogdan ? 0 %)
    • Cosmics HCAL
    • Cosmics Shower
    • Cosmics Hodoscope
    • Test 10 gig link to DAQ
    • EPICS script
    • alarm handler (David)
  • Outstanding issues
    • 2 bad FADCs Bigbite - 1 FADC was repaired - one being repaired - 1 Compton FADC - repaired can use as spare ( done )
    • SD delay : still need 2 SDs ( Glasgow and INFN just requested quote )
    • need to adjust for HCAL transit time with different PMTs
    • status of cosmics paddles ( installed by Bogdan )
    • GEM fibers too short : Mark will order parts
    • 15 bad MPDs - need to look at fixing - Ben ? Dustin loaning us 6 MPDs - need 85 total - 67 in hand - 1 MPD (301) VME address issue in some slot -
      • APV needed 1208 - 966 in hand working - Michael might lend 40 - ( check with Thir )
    • GEM fiber possibly bad - 2 broken - if long sleeve want to pull spare in separate conduit
    • GEM HV IP need setup ( Alex ) Done
    • GEM clock/trigger box