Difference between revisions of "September 3rd 2021"
From Hall A Wiki
Line 44: | Line 44: | ||
**CDet | **CDet | ||
**GEM BigBite | **GEM BigBite | ||
− | ***took* | + | ***took cosmics data with UVA UV channels and taking data now with |
− | + | ***INFN still has HV issues - | |
+ | ***APV get zapped by HV - no way to disable a particular APV by software | ||
+ | ***module might be replaced or might replace whole layer | ||
+ | ***other module which might have bad cabling - can check when OSP approve | ||
+ | **UVA GEM | ||
+ | ***taking cosmics | ||
+ | ***setup in EEL126 - | ||
+ | *** want to run optical - DAQ still being put back together - late next week at earliest | ||
**RF time | **RF time | ||
**need add TDC | **need add TDC | ||
**HV | **HV | ||
+ | ***CAEN HV used for INFN - non zero current from power supply - up to 200 nA - could be offset | ||
+ | ***HV cables to MPOD for spares | ||
+ | ***CAEN HV : bug in EPICS driver fixed, seems ok for now | ||
+ | ***CAEN VME avalaible | ||
**Scalers | **Scalers | ||
***need cabling | ***need cabling | ||
***need work on readout | ***need work on readout | ||
− | *** | + | ***one SIS set to 3801 for helicity in slot 16, rest 3800 - pulser can make fake helicity signal and LNE - can add a few BCM channels and add L1A to check synchronization |
− | *** | + | ***TI working now - can test read out - check on every event - reported helicity - |
***FADC for BPM/raster + helicity signal | ***FADC for BPM/raster + helicity signal | ||
− | *** | + | ***minimum rate to make sure we don't miss some windows |
− | + | ||
**Recoil polarimeter | **Recoil polarimeter | ||
**EPICS | **EPICS | ||
+ | ***hacweb7 back on network, alarm handler scripts copied , sound installed - David will set it up with Steve | ||
+ | ***alarm handler gives a lot of error for some records | ||
+ | ***might be routing issue, might need to check with Brad Cumbia | ||
+ | ***some inconsistencies in EPICS gateway , need to make sure | ||
**BCM | **BCM | ||
− | *** | + | ***linearity test on dnew and unew, David working with Dave - dnew 0.1% and unew 0.4% - scanning 1 uA to 170 uA |
− | ** | + | **BPM |
− | *** | + | ***will look for Jason write up for twiddle testing |
− | + | ||
**Helicity | **Helicity | ||
− | *** | + | ***issues getting readout to work properly with FADC |
− | *** | + | ***testing with TEDF crate, early next week |
− | + | ||
− | + | ||
**start / stop / EPICS script | **start / stop / EPICS script | ||
***working on tedbbdaq for test setup | ***working on tedbbdaq for test setup | ||
− | ***will update scripts on | + | ***will update scripts on ada |
*On-going tasks | *On-going tasks | ||
**Network setup ( done ) - SBS MPD side might need few cables - need pull network for SBS side (0%) - should check when bunker is setup | **Network setup ( done ) - SBS MPD side might need few cables - need pull network for SBS side (0%) - should check when bunker is setup | ||
− | **Scaler crate setup (90 % - Steve - need add readout) - Steve could not talk to CPU (done) - IP fixed with DHCP - need change fan tray - CAEN ( done ) | + | **Scaler crate setup (90 % - Steve - need add readout) - Steve could not talk to CPU (done) - IP fixed with DHCP - need change fan tray - CAEN ( done ) - need try reset with ethernet of CAEN crate - send info to Bryan |
− | **documentation of VME crate names to power cycle - need to make sure all VXS are in dhcp -Bryan ( done ) https://hallaweb.jlab.org/wiki/index.php/SBS_Network_Devices_in_Hall_A | + | **documentation of VME crate names to power cycle - need to make sure all VXS are in dhcp -Bryan ( done ) https://hallaweb.jlab.org/wiki/index.php/SBS_Network_Devices_in_Hall_A |
**3 rd GEM VXS crate install router moved up ( 100% ) | **3 rd GEM VXS crate install router moved up ( 100% ) | ||
**need power and network in GEM bunker ( done ) | **need power and network in GEM bunker ( done ) | ||
**boot VME controllers (100 % done - need ask hostname TS crate ) | **boot VME controllers (100 % done - need ask hostname TS crate ) | ||
**TS cables - all fibers plugged (done) - will post informations -hodoscope / grinch/ shower separate - can be combined at any time now everything plugged to TS | **TS cables - all fibers plugged (done) - will post informations -hodoscope / grinch/ shower separate - can be combined at any time now everything plugged to TS | ||
− | - new firmware for LHRS TI - | + | - new firmware for LHRS TI ( still need to update)- |
+ | **LHRS can still use adev account | ||
+ | ***all crates tested individually with TS by Bryan besides HCAL - | ||
+ | ***config Shower and GEM - issues with TI or fiber being investigated | ||
**detector cabling ( 100 % - debugging ) | **detector cabling ( 100 % - debugging ) | ||
− | **new MPD production - about to start - FPGA received by Paolo - need check when production starts | + | **new MPD production - about to start - FPGA received by Paolo - need check when production starts - need follow up with Paolo |
− | **MPD VTP readout - on-going in daq lab - still having issue getting APV sending data to MPD - events going through high speed link | + | **MPD VTP readout - on-going in daq lab - still having issue getting APV sending data to MPD - events going through high speed link - (done using for taking all GEM data ) |
**MPD being setup in Hall A - need setup VTPs to boot (done ) - 10 gigE network plugged (done) - will be able to test in Hall A (done) - 5.2 KHz max trigger rate - 900 MB/s max per VTP - LV installed soon (done ) | **MPD being setup in Hall A - need setup VTPs to boot (done ) - 10 gigE network plugged (done) - will be able to test in Hall A (done) - 5.2 KHz max trigger rate - 900 MB/s max per VTP - LV installed soon (done ) | ||
**setup portservers : 1 4 port portserver for VTP (done), still need to set up a 8 port one and HCAL portserver - need one more | **setup portservers : 1 4 port portserver for VTP (done), still need to set up a 8 port one and HCAL portserver - need one more | ||
Line 91: | Line 105: | ||
**Bigbite - HCal trigger setup - need check with Bob if additionnal NIM crate need to be install - might be ok with current NIM crate | **Bigbite - HCal trigger setup - need check with Bob if additionnal NIM crate need to be install - might be ok with current NIM crate | ||
**TS setup - 90 % - all cabled - still need to configs | **TS setup - 90 % - all cabled - still need to configs | ||
− | **Beamline crate setup ( in scaler crate ) - FADC is in scaler need to be setup - need pull raster BPM BCM (0% will do it with David and Bob, Jack Heidi helping ) | + | **Beamline crate setup ( in scaler crate ) - FADC is in scaler need to be setup - need pull raster BPM BCM (0% will do it with David and Bob, Jack Heidi helping ) - time estimate ? Jack and Heidi |
**HCAL cabling ( done ) | **HCAL cabling ( done ) | ||
**HCAL need power ( done, Berta ) | **HCAL need power ( done, Berta ) | ||
Line 101: | Line 115: | ||
**Cosmics Shower ( on going ) | **Cosmics Shower ( on going ) | ||
**Cosmics Hodoscope ( on-going ) | **Cosmics Hodoscope ( on-going ) | ||
− | **Cosmics Grinch | + | **Cosmics Grinch (on going ) |
**Test 10 gig link to DAQ to adaq1 - 900 MB/s - will try with two VTP | **Test 10 gig link to DAQ to adaq1 - 900 MB/s - will try with two VTP | ||
**New computers have been installed - Main DAQ computer still not received - | **New computers have been installed - Main DAQ computer still not received - | ||
Line 110: | Line 124: | ||
**Issue with CAEN HV for Hodoscope with EPICS | **Issue with CAEN HV for Hodoscope with EPICS | ||
− | **2 bad FADCs Bigbite - 1 FADC was repaired - one being repaired - 1 Compton FADC - repaired can use as spare ( done ) | + | **2 bad FADCs Bigbite - 1 FADC was repaired - one being repaired - 1 Compton FADC - repaired can use as spare ( done ) - 1 more FADC shower to be repaired - |
1 more bad FADC on shower ( 1 channel bad ) | 1 more bad FADC on shower ( 1 channel bad ) | ||
− | **SD delay : still need 2 SDs ( Glasgow and INFN just requested quote ) Hall B lending two - will get once checked | + | **SD delay : still need 2 SDs ( Glasgow and INFN just requested quote ) Hall B lending two - will get once checked - |
− | **need to adjust for HCAL transit time with different PMTs - looked at it already, about 12 ns - 20 cable after summing - still need to look with led | + | **need to adjust for HCAL transit time with different PMTs - looked at it already, about 12 ns - 20 cable after summing (done) - still need to look with led |
− | **status of cosmics paddles ( installed by Bogdan ) - HCAL paddles in test lab still need to be set up - Scott checked with techs - will push next week | + | **status of cosmics paddles ( installed by Bogdan ) - HCAL paddles in test lab still need to be set up - Scott checked with techs - will push next week - will do it when crane is in |
**GEM fibers too short : Mark will order parts - ( fiber ordered - + 2 extensions ordered ) | **GEM fibers too short : Mark will order parts - ( fiber ordered - + 2 extensions ordered ) | ||
− | **15 bad MPDs - need to look at fixing - Ben ? Dustin loaning us 6 MPDs - need 85 total - 67 in hand - 1 MPD (301) VME address issue in some slot - | + | **15 bad MPDs - need to look at fixing - Ben ? Dustin loaning us 6 MPDs - need 85 total - 67 in hand - 1 MPD (301) VME address issue in some slot - ( at least 2 bad MPDs ) - check google doc |
− | ***APV needed 1208 - 966 in hand working - Michael might lend 40 - ( check with Thir ) | + | ***APV needed 1208 - 966 in hand working - Michael might lend 40 - ( check with Thir ) - still need 95 - |
**GEM fiber possibly bad - 2 broken - if long sleeve want to pull spare in separate conduit ( extension setup - 50 % ) | **GEM fiber possibly bad - 2 broken - if long sleeve want to pull spare in separate conduit ( extension setup - 50 % ) | ||
**GEM HV IP need setup ( Alex ) Done | **GEM HV IP need setup ( Alex ) Done | ||
**GEM clock/trigger box for BB side ( got one from UVA ) | **GEM clock/trigger box for BB side ( got one from UVA ) | ||
**GEM LV remote control ( done ) | **GEM LV remote control ( done ) | ||
− | **GEM VTP transceivers hanging - ( swapped with SSP - firmware fix will be implemented ) | + | **GEM VTP transceivers hanging - ( swapped with SSP - firmware fix will be implemented - need to check with Ben ) |
**SBS bunker cables | **SBS bunker cables | ||
***fiber order | ***fiber order | ||
− | ***test multiple event builder soon | + | ***test multiple event builder soon |
*Status software in a-onl@aonl1 | *Status software in a-onl@aonl1 | ||
*GRINCH | *GRINCH | ||
− | **still need to install - need to check if commits were merged | + | **still need to install - need to check if commits were merged |
+ | **still running locally - | ||
*Shower | *Shower | ||
**installed | **installed | ||
+ | **one script working with TS files | ||
*GEM | *GEM | ||
**Andrew still need to set it up there | **Andrew still need to set it up there | ||
*Hodoscope | *Hodoscope | ||
− | **installed | + | **installed |
*HCAL | *HCAL | ||
**setup and can look at data | **setup and can look at data | ||
Line 144: | Line 160: | ||
**want run GEM and shower | **want run GEM and shower | ||
**readout list ready - just need CODA configs | **readout list ready - just need CODA configs | ||
− | **TS for V792 gate | + | **TS for V792 gate ( not sure where to get the gate - TS output fast L1A - Bryan will send info to Mark ) |
*coincidence Shower and hodoscope in TS2 of GEM | *coincidence Shower and hodoscope in TS2 of GEM |
Latest revision as of 11:58, 3 September 2021
- Updates
- HCal
- new TI swapped
- all fibers connected
- Bryan will make the HCal config
- TDC reference time working now
- extra FADC with copy of trigger ( reference ) ( make sure the shaper is in and it is the good one ) , 10 supercluster analog sums - might need different latency for the reference time
- need to check linear fan/in for offsets
- need double check no capacitive coupling in wrong place
- might need to add capacitor on some channels if needed
- 10 ns cable extension to JLab PMTs - clusters line up better
- can check with LED, but LED not yet ready
- is there air flushing on PMT ? Not
- Bigbite Shower
- finished pulser test for shower and preshower
- HCal
(look up table of ratios : some modules have isses in shower and still investigating preshower )
- could not find any linear fan in/out - need check to Bogdan or Jack
- might be modules in LHRS that might not be in used
- connected cables from BB discrimator to HCAL DAC, threshold can be changed remotely
- installing 2 FADCs in hodoscope crate for sum monitoring
- one FADC channel was not working 1-4 - will remove FADC to be repaired
- coincidence trigger : can work with Bob and Scott today - pulser ready
- continue to debug and take cosmics overnight
- need clean up area
- all scalers plugged and to F1 - some features in TDC might be odd
- need FADC trigger cables
- Bigbite Hodoscope
- noise issue figured out
- could take data with DAQ and troubleshooting
- 4 data runs at 4 different HV, of lower detector, next middle and upper third
- still couple of channels to check
- will try to add to full DAQ when not in use
- GRINCH
- setting up timing set up, using hodoscope trigger - signal was too long - shorten cabled - ADC gate working
- everything reading out - some decoding issue - to look at the data
- OSP submitted to work on upper half of detector - all ADC channels working
- few TDC/ PMTs
- LHRS
- no major updates
- waiting for cables
- will try with TS
- different modes : running mode with and with fastbus
- Bryan tried run slave config
- CDet
- GEM BigBite
- took cosmics data with UVA UV channels and taking data now with
- INFN still has HV issues -
- APV get zapped by HV - no way to disable a particular APV by software
- module might be replaced or might replace whole layer
- other module which might have bad cabling - can check when OSP approve
- UVA GEM
- taking cosmics
- setup in EEL126 -
- want to run optical - DAQ still being put back together - late next week at earliest
- RF time
- need add TDC
- HV
- CAEN HV used for INFN - non zero current from power supply - up to 200 nA - could be offset
- HV cables to MPOD for spares
- CAEN HV : bug in EPICS driver fixed, seems ok for now
- CAEN VME avalaible
- Scalers
- need cabling
- need work on readout
- one SIS set to 3801 for helicity in slot 16, rest 3800 - pulser can make fake helicity signal and LNE - can add a few BCM channels and add L1A to check synchronization
- TI working now - can test read out - check on every event - reported helicity -
- FADC for BPM/raster + helicity signal
- minimum rate to make sure we don't miss some windows
- Recoil polarimeter
- EPICS
- hacweb7 back on network, alarm handler scripts copied , sound installed - David will set it up with Steve
- alarm handler gives a lot of error for some records
- might be routing issue, might need to check with Brad Cumbia
- some inconsistencies in EPICS gateway , need to make sure
- BCM
- linearity test on dnew and unew, David working with Dave - dnew 0.1% and unew 0.4% - scanning 1 uA to 170 uA
- BPM
- will look for Jason write up for twiddle testing
- Helicity
- issues getting readout to work properly with FADC
- testing with TEDF crate, early next week
- start / stop / EPICS script
- working on tedbbdaq for test setup
- will update scripts on ada
- On-going tasks
- Network setup ( done ) - SBS MPD side might need few cables - need pull network for SBS side (0%) - should check when bunker is setup
- Scaler crate setup (90 % - Steve - need add readout) - Steve could not talk to CPU (done) - IP fixed with DHCP - need change fan tray - CAEN ( done ) - need try reset with ethernet of CAEN crate - send info to Bryan
- documentation of VME crate names to power cycle - need to make sure all VXS are in dhcp -Bryan ( done ) https://hallaweb.jlab.org/wiki/index.php/SBS_Network_Devices_in_Hall_A
- 3 rd GEM VXS crate install router moved up ( 100% )
- need power and network in GEM bunker ( done )
- boot VME controllers (100 % done - need ask hostname TS crate )
- TS cables - all fibers plugged (done) - will post informations -hodoscope / grinch/ shower separate - can be combined at any time now everything plugged to TS
- new firmware for LHRS TI ( still need to update)-
- LHRS can still use adev account
- all crates tested individually with TS by Bryan besides HCAL -
- config Shower and GEM - issues with TI or fiber being investigated
- detector cabling ( 100 % - debugging )
- new MPD production - about to start - FPGA received by Paolo - need check when production starts - need follow up with Paolo
- MPD VTP readout - on-going in daq lab - still having issue getting APV sending data to MPD - events going through high speed link - (done using for taking all GEM data )
- MPD being setup in Hall A - need setup VTPs to boot (done ) - 10 gigE network plugged (done) - will be able to test in Hall A (done) - 5.2 KHz max trigger rate - 900 MB/s max per VTP - LV installed soon (done )
- setup portservers : 1 4 port portserver for VTP (done), still need to set up a 8 port one and HCAL portserver - need one more
- need to install remote switch for crate in bunker (done hareboot32) - rest are VXS or VME64 - need put CAEN crate on network
- Bigbite - HCal trigger setup - need check with Bob if additionnal NIM crate need to be install - might be ok with current NIM crate
- TS setup - 90 % - all cabled - still need to configs
- Beamline crate setup ( in scaler crate ) - FADC is in scaler need to be setup - need pull raster BPM BCM (0% will do it with David and Bob, Jack Heidi helping ) - time estimate ? Jack and Heidi
- HCAL cabling ( done )
- HCAL need power ( done, Berta )
- Mark hodoscope trigger ( done )
- Computer move to Hall A : sbsdaq1/2/3 tedbbdaq (done ) enpcamsonne ( done ) - need to install X server - Need ask Ole -
- LHRS fiber pull ( waiting fiber August 13th ) - most likely LHRS at end of SBS run (done )
- Cosmics trigger ( done ) -
- Cosmics HCAL ( ongoing )
- Cosmics Shower ( on going )
- Cosmics Hodoscope ( on-going )
- Cosmics Grinch (on going )
- Test 10 gig link to DAQ to adaq1 - 900 MB/s - will try with two VTP
- New computers have been installed - Main DAQ computer still not received -
- EPICS script -
- alarm handler (David) - still need to set up on adaqsc - check with Ole to have hacweb7 online and copy - need to make sure audio avalable for alarm
- LHRS can still use adev account
- Outstanding issues
- Issue with CAEN HV for Hodoscope with EPICS
- 2 bad FADCs Bigbite - 1 FADC was repaired - one being repaired - 1 Compton FADC - repaired can use as spare ( done ) - 1 more FADC shower to be repaired -
1 more bad FADC on shower ( 1 channel bad )
- SD delay : still need 2 SDs ( Glasgow and INFN just requested quote ) Hall B lending two - will get once checked -
- need to adjust for HCAL transit time with different PMTs - looked at it already, about 12 ns - 20 cable after summing (done) - still need to look with led
- status of cosmics paddles ( installed by Bogdan ) - HCAL paddles in test lab still need to be set up - Scott checked with techs - will push next week - will do it when crane is in
- GEM fibers too short : Mark will order parts - ( fiber ordered - + 2 extensions ordered )
- 15 bad MPDs - need to look at fixing - Ben ? Dustin loaning us 6 MPDs - need 85 total - 67 in hand - 1 MPD (301) VME address issue in some slot - ( at least 2 bad MPDs ) - check google doc
- APV needed 1208 - 966 in hand working - Michael might lend 40 - ( check with Thir ) - still need 95 -
- GEM fiber possibly bad - 2 broken - if long sleeve want to pull spare in separate conduit ( extension setup - 50 % )
- GEM HV IP need setup ( Alex ) Done
- GEM clock/trigger box for BB side ( got one from UVA )
- GEM LV remote control ( done )
- GEM VTP transceivers hanging - ( swapped with SSP - firmware fix will be implemented - need to check with Ben )
- SBS bunker cables
- fiber order
- test multiple event builder soon
- Status software in a-onl@aonl1
- GRINCH
- still need to install - need to check if commits were merged
- still running locally -
- Shower
- installed
- one script working with TS files
- GEM
- Andrew still need to set it up there
- Hodoscope
- installed
- HCAL
- setup and can look at data
- All crates
- want run GEM and shower
- readout list ready - just need CODA configs
- TS for V792 gate ( not sure where to get the gate - TS output fast L1A - Bryan will send info to Mark )
- coincidence Shower and hodoscope in TS2 of GEM