Difference between revisions of "Hadron DAQ re-installation"

From Hall A Wiki
Jump to: navigation, search
(Hadron Package DAQ)
Line 2: Line 2:
  
 
== Hadron Package DAQ ==
 
== Hadron Package DAQ ==
 +
 +
* Remove all NIM/CAMAC/VME modules that will not be used.
 +
* Replace Linear FI/FO in second NIM bin.
 +
** Recable all dE linear sums (L+R) from 50/50 splitters and to CAMAC Discriminators
 +
* Recable all E (dE) from x10 Amplifiers (50/50 splitters) to CAMAC Discriminators
 +
* Verify mapping of E and dE delay line from x10 Amplifiers to VME ADCs.
 +
* Cable E and dE scintillators from Hadron Package to DAQ Weldment Patch Panels
  
 
== Neutron Detector DAQ ==
 
== Neutron Detector DAQ ==

Revision as of 19:00, 10 March 2009

Plan/Checklist for Re-Installing the BigBite Hadron DAQ (including Neutron Detector).

Hadron Package DAQ

  • Remove all NIM/CAMAC/VME modules that will not be used.
  • Replace Linear FI/FO in second NIM bin.
    • Recable all dE linear sums (L+R) from 50/50 splitters and to CAMAC Discriminators
  • Recable all E (dE) from x10 Amplifiers (50/50 splitters) to CAMAC Discriminators
  • Verify mapping of E and dE delay line from x10 Amplifiers to VME ADCs.
  • Cable E and dE scintillators from Hadron Package to DAQ Weldment Patch Panels

Neutron Detector DAQ