Difference between revisions of "D2n Talks/Reports"

From Hall A Wiki
Jump to: navigation, search
(Add progress reports below.)
m (22 May 2009 Transversity Collaboration Meeting:)
Line 18: Line 18:
 
** BigBite Optics [[Media:BB_Optics-Xin.pdf]]
 
** BigBite Optics [[Media:BB_Optics-Xin.pdf]]
 
** Analysis block diagram (Jiang) [[Media:transn_collaboration_meet_052209-Jiang.pdf]]
 
** Analysis block diagram (Jiang) [[Media:transn_collaboration_meet_052209-Jiang.pdf]]
** Target Water NMR Analysis (Yi Zhang)[[Media:Target_Water_NMR-ZhangYi.pdf]]
+
** Target Water NMR Analysis (Yi Zhang) [[Media:Target_Water_NMR-ZhangYi.pdf]]
 
** LHRS Calibrations (Dutta) [[Media:LRHS_Calib-Dutta.pdf]]
 
** LHRS Calibrations (Dutta) [[Media:LRHS_Calib-Dutta.pdf]]
 
** Coincidence Timing and Farm Production [[Media:Coin_Timing_and_Farm_Production-Huang.pdf]]
 
** Coincidence Timing and Farm Production [[Media:Coin_Timing_and_Farm_Production-Huang.pdf]]
 
** BigBite Shower, Scaler, and Beamline Calib [[Media:BB_Shower_Scaler_Beamline_Calib-Allada.pdf]]
 
** BigBite Shower, Scaler, and Beamline Calib [[Media:BB_Shower_Scaler_Beamline_Calib-Allada.pdf]]
 
  
 
=== 26 May 2009 Phone Meeting: ===
 
=== 26 May 2009 Phone Meeting: ===

Revision as of 09:20, 3 June 2009

How to connect to a d2n VNC Session

Earlier Collaboration Meetings

Add progress reports below.

17 April 2009 Phone meeting:

12 May 2009 Phone Meeting:

22 May 2009 Transversity Collaboration Meeting:

26 May 2009 Phone Meeting: