  [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009235455.html t0 for VDC (done 10-09)]]
 
  [[http://www.jlab.org/~adaq/halog/html/1010_archive/101009235455.html t0 for VDC (done 10-09)]]
  
== LHRS optics run (no sieve/sieve)=
+
== LHRS optics run (no sieve/sieve)==
 
Ye Zhihong is interested in this analysis)
 
Ye Zhihong is interested in this analysis)
  

Revision as of 19:15, 10 October 2010

Back to DVCS

This page is in progress, please new items to it. When you obtain a result, log in into the Halog and link it to this page. if you are willing to take charge of a given analysis, please indicate it on this page as well as the date at which you are starting to work on it.

Matching data taking with run plans

  • Update the how to
  • Maintain db_run.dat file: Make sure that every LHRS momentum and angle changes are logged
  • Start a database of run indicating line by line the run number, the target in position, the average beam current, LHRs pnom, LHRS angle, goal

Luminosity, efficiency

  • Boiling test:
    • Establish history of the data taking against the boiling test
    • Analyze data of the boiling test, conclude
  • Trigger efficiency

Analyze data taken on the week-end of 10-09 and 10-10 with T3 and T4 trigger

LHRS commissioning

Calibrate the ADCs:

Still to be done S1, Pion rejector,

[Cerenkov (partially done, missing cer1, 10-09)], [S2 (done 10-09)]

Calibrate detector time spectra:

Still to be done : understand timing spectra for S1,S2 and the Cerenkov

[t0 for VDC (done 10-09)]

LHRS optics run (no sieve/sieve)

Ye Zhihong is interested in this analysis)

    • Establish history of the data taking against the optics run plan. Add run numbers to each step of the plan
    • Define goals of analysis
    • Carry on analysis (

DVCS Calorimeter