Difference between revisions of "G2p documentation"
From Hall A Wiki
(→Operational Safety Procedures (OSP)) |
(→Operational Safety Procedures (OSP)) |
||
Line 47: | Line 47: | ||
| (in review) | | (in review) | ||
| G2P Beam dump insert extraction | | G2P Beam dump insert extraction | ||
− | | [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/docs/ | + | | [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/docs/final/cartridge_replacement_OSP.doc OSP] |
|} | |} | ||
Revision as of 08:39, 1 March 2012
All information from the 2012 Safety Review is here
Operational Safety Procedures (OSP)
Doc# | Title | link |
---|---|---|
ENG-11-035.OSP | Procedure for ... FZ Magnets and FZ Power Supplies | OSP |
PHY-11-037.OSP | Safe Operation of the Big Bite Power Supply | OSP |
PHY-11-036.OSP | Safe Operation of the HKS Power Supply | OSP |
PHY-11-038.OSP | Septum Magnet Commissioning, Operation, and Troubleshooting | OSP |
PHY-11-046.OSP | Hall A Slow Raster | OSP |
PHY-11-047.OSP | Hall A Tungsten Calorimeter Operation | OSP |
ACC-12-006.OSP | FZ #2 Magnet, Magnet Arms, and Girder Adjustments (in review) | OSP |
PHY-12-008-OSP | Operation of solid polarized target in Hall A | OSP |
(in review) | G2P 3rd Arm Access | OSP THA |
(in review) | G2P Beam dump insert extraction | OSP |
Supporting Documents
Title | link |
---|---|
RSAD : Radiological Safety Analysis Document (in review) | doc |
Radiation Damage Doses to Septum Coils During g2p | |
COO : Conduct of Operations (updated 2/4/12) | |
ESAD : Experimental Safety Assesment Document (updated 2/4/12) | |
Polarized Target Primer | |
Hazard Awareness & Safety Guidelines | pdf pdf |
Pre Beam Checklist | docx |
December Commissioning | TOSP |
Septa Field Mapping | TOSP |
Notes
- Overview of JLab's Operational Safety Procedure Program.
- JLab OSP template.
- List of previous JLab OSPs.
- JLab Docushare