Difference between revisions of "G2p documentation"

From Hall A Wiki
Jump to: navigation, search
(Operational Safety Procedures (OSP))
 
Line 45: Line 45:
 
   | [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/docs/final/PHY-12-014-OSP.pdf OSP]   
 
   | [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/docs/final/PHY-12-014-OSP.pdf OSP]   
 
|-
 
|-
   | (in review)
+
   | ESH-12-007-TOSP
 
   | G2P Local Dump Cartridge Replacement  
 
   | G2P Local Dump Cartridge Replacement  
   | [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/docs/final/cartridge_replacement_OSP.doc TOSP]
+
   | [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/docs/final/Document-59594.pdf TOSP]
 
|-
 
|-
 
   | PHY-12-004-TOSP
 
   | PHY-12-004-TOSP
Line 56: Line 56:
 
   | Testing a Prototype Cherenkov Detector in Hall A
 
   | Testing a Prototype Cherenkov Detector in Hall A
 
   | [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/docs/support/PHY-12-009-OSP.pdf OSP]
 
   | [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/docs/support/PHY-12-009-OSP.pdf OSP]
|-
 
  | ESH-12-007-TOSP
 
  | G2P Local Dump Cartridge Replacement
 
  | [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/docs/final/Document-59594.pdf TOSP]
 
 
|}
 
|}
  

Latest revision as of 13:59, 19 April 2012

All information from the 2012 Safety Review is here

Operational Safety Procedures (OSP)

Doc# Title link
ENG-11-035.OSP Procedure for ... FZ Magnets and FZ Power Supplies OSP
PHY-11-037.OSP Safe Operation of the Big Bite Power Supply OSP
PHY-11-036.OSP Safe Operation of the HKS Power Supply OSP
PHY-11-038.OSP Septum Magnet Commissioning, Operation, and Troubleshooting OSP
PHY-11-046.OSP Hall A Slow Raster OSP
PHY-11-047.OSP Hall A Tungsten Calorimeter Operation OSP
ACC-12-006.OSP FZ #2 Magnet, Magnet Arms, and Girder Adjustments (in review) OSP
PHY-12-008-OSP Operation of solid polarized target in Hall A OSP
PHY-12-014-OSP G2P 3rd Arm Access OSP
ESH-12-007-TOSP G2P Local Dump Cartridge Replacement TOSP
PHY-12-004-TOSP Target field measurement for g2p TOSP
PHY-12-009-OSP Testing a Prototype Cherenkov Detector in Hall A OSP

Supporting Documents

Title link
RSAD : Radiological Safety Analysis Document pdf
Radiation Damage Doses to Septum Coils During g2p pdf
COO : Conduct of Operations (updated 3/13/12) pdf
ESAD : Experimental Safety Assesment Document (updated 2/4/12) pdf
Polarized Target Primer pdf
Hazard Awareness & Safety Guidelines pdf pdf
Pre Beam Checklist docx
December Commissioning TOSP
Septa Field Mapping TOSP

Notes