Difference between revisions of "G2p Analysis Minutes"
Line 18: | Line 18: | ||
'''Status Update:<br> | '''Status Update:<br> | ||
+ | *Guy: | ||
+ | 1) Have analysis meetings in Israel. Analyzing the data. <br> | ||
+ | 2) Need to discuss how to do the dilution factor calculation. <br> | ||
*Jixie: | *Jixie: | ||
− | 1) working on optics analysis | + | 1) working on optics analysis. |
− | Min: | + | *Min: |
+ | 1) Calculating the uncertainty of pointing. Discussing with Nilanga about it. | ||
+ | |||
+ | *Chao: | ||
+ | 1) Working on helicity reconstruction. Need Pengjia to cross check this when finish. <br> | ||
+ | 2) will cross check BCM calibration soon. <br> | ||
+ | |||
+ | *Toby: | ||
+ | 1) Preparing the target material table for target calibration. <br> | ||
Revision as of 17:02, 30 May 2012
Minutes of the weekly analysis meetings
5/30/2012: Present: Jixie, Min, Pengjia, Melissa, Jie, Xiaochao, JP, Chao, Toby, Melissa By-Phone: Karl, Guy
General discussion (JP, Karl, ...):
1) Chiral Dynamics Workshop will be held at Jlab in Aug 6-10. The deadline for submission is June 1.
Please submit abstract.
2) Gorden conference will take place at the
same time. Submit abstract before deadline!
3) G2P group will give 3 talks for the Hall-A collaboration meeting . We will meet next Wednesday 13:00-15:00
to practice the talks and giving feed-back. Jixie has reserved L207. (Jun 6, 13:00 - 15:00).
Feature presentation:
1) Pengjia: Preliminary BCM calibration Result
Status Update:
- Guy:
1) Have analysis meetings in Israel. Analyzing the data.
2) Need to discuss how to do the dilution factor calculation.
- Jixie:
1) working on optics analysis.
- Min:
1) Calculating the uncertainty of pointing. Discussing with Nilanga about it.
- Chao:
1) Working on helicity reconstruction. Need Pengjia to cross check this when finish.
2) will cross check BCM calibration soon.
- Toby:
1) Preparing the target material table for target calibration.