<li>7.3 GeV @ 4 pass, 5.5GeV @ 3 Pass and 3.7 GeV @ 2 pass. No five pass beam in the Fall of 2014.
 
<li>7.3 GeV @ 4 pass, 5.5GeV @ 3 Pass and 3.7 GeV @ 2 pass. No five pass beam in the Fall of 2014.
 
</ul>
 
</ul>
 +
 +
== Pre-beam Checklist ==
  
 
== Commissioning and Calibrations ==
 
== Commissioning and Calibrations ==
 
=== Beamline ===
 
=== Beamline ===

Revision as of 15:41, 6 October 2014

For the Fall of 2014 assume:

  • max 20 uA but for short times it can go higher for boiling studies and BCM calibration.
  • 7.3 GeV @ 4 pass, 5.5GeV @ 3 Pass and 3.7 GeV @ 2 pass. No five pass beam in the Fall of 2014.