== Pre-beam Checklist ==
 
== Pre-beam Checklist ==
 +
<b>Trigger Checkout</b> (Experts)
 +
Checkout trigger timing
 +
Checkout of EDTM (Barak Schmookler)
 +
Think about adding 60, 100, 150, and 200 ns wide electronic deadtime scalers
 +
 +
*  This has been found to be a robust method for determining electronic deadtime in Hall C and we
 +
should think about adding something similar for GMP.
  
 
== Commissioning and Calibrations ==
 
== Commissioning and Calibrations ==
 
=== Beamline ===
 
=== Beamline ===

Revision as of 15:42, 6 October 2014

For the Fall of 2014 assume:

  • max 20 uA but for short times it can go higher for boiling studies and BCM calibration.
  • 7.3 GeV @ 4 pass, 5.5GeV @ 3 Pass and 3.7 GeV @ 2 pass. No five pass beam in the Fall of 2014.

Pre-beam Checklist

Trigger Checkout (Experts)

Checkout trigger timing
Checkout of EDTM (Barak Schmookler)
Think about adding 60, 100, 150, and 200 ns wide electronic deadtime scalers
  • This has been found to be a robust method for determining electronic deadtime in Hall C and we

should think about adding something similar for GMP.

Commissioning and Calibrations

Beamline