Laser System

  1. Assemble COMET Lasers (Chiranjib/Yi)
  2. Move in a Rack to new target lab for COMET Lasers
  3. Interlock connections to Lasers (Mark/Yi)
  4. Interlock connections in the Hall (Mark/Yi)
  5. RTDs for Laser enclosure (Done by Yi'/Yi)
  6. RTDs to readout chassis (Yi')
  7. Optics setup (Chiranjib/Jin)
  8. Optics alignment (Chiranjib/Jin/Yi'/Yi/Jian-ping)
  9. Camera (Jin)
  10. Spectrum Analyzer (Yi)

Oven and Heater

  1. Heater Installation (Joe)
  2. Heater Control Box and connection (Joe)
  3. Oven temperature control RTD (Yi')
  4. RTDs for He3 Cell and Reference Cell (Done by Yi'/Yi)

NMR System

  1. Longitudinal RF Coil Connection (Yi')
  2. Pickup Coil Cables (Chiranjib/Yi')
  3. VI update (Jin/Yi)

EPR System

  1. EPR D2 assembly (Chiranjib/Yi)
  2. EPR RF Cable (Chiranjib/Yi')

Spin Flip

  1. Test plan (Yi/Jin)
  2. EPICS communication (Jin)
  3. VI update (Yi/Jin)

Holding Field

  1. Optimal Field determination (Yi')
  2. Correction Field Calculation (Yi')
  3. Correction Coil connection (Chiranjib/Yi')