Difference between revisions of "Wednesday, Mar. 02: SWING Shift"
From Hall A Wiki
Line 3: | Line 3: | ||
* BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG | * BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG | ||
* Need shift crews for future | * Need shift crews for future | ||
+ | |||
+ | |||
<b>Specific mission</b> | <b>Specific mission</b> | ||
* <b>Production Run</b> | * <b>Production Run</b> | ||
* Set up the beam through Compton chicane | * Set up the beam through Compton chicane | ||
+ | |||
+ | |||
<b>Upcoming event(Short Term)</b> | <b>Upcoming event(Short Term)</b> | ||
Line 17: | Line 21: | ||
* Detailed Plan [https://hallaweb.jlab.org/ here] | * Detailed Plan [https://hallaweb.jlab.org/ here] | ||
− | b>Upcoming event(Long Term)</b> | + | |
+ | |||
+ | <b>Upcoming event(Long Term)</b> | ||
* BCM calibration (high beam current 30uA(60 ideal),FC, invasive Hall-D(deal with them, possible Monday ??)) | * BCM calibration (high beam current 30uA(60 ideal),FC, invasive Hall-D(deal with them, possible Monday ??)) | ||
* Target boiling test 30uA(60 ideal) | * Target boiling test 30uA(60 ideal) |
Revision as of 13:38, 2 March 2016
Go back to Daily Run Plan Daily Run Plans
- General considerations
- BTA: SL makes sure to submit his/her BTA successfully and be shown in HALOG
- Need shift crews for future
Specific mission
- Production Run
- Set up the beam through Compton chicane
Upcoming event(Short Term)
- Note: MCC RF recovery (8:30-11:30AM, Thursday)
Access Wish List:(controlled access) 1/ Series of magnet measurement <: 30min/ no beam/ but beam permit 2/ Andrew Lumanog (327-5523) : <1hr 3/ Compton : check laser profile : <1hr
- Detailed Plan here
Upcoming event(Long Term)
- BCM calibration (high beam current 30uA(60 ideal),FC, invasive Hall-D(deal with them, possible Monday ??))
- Target boiling test 30uA(60 ideal)
- Detailed instructions
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carborn hole target and make sure you can see the hole through Spot++