Difference between revisions of "Thursday, Mar. 03: DAY Shift"

From Hall A Wiki
Jump to: navigation, search
Line 4: Line 4:
  
 
<b>Specific mission</b>
 
<b>Specific mission</b>
* Note:  
+
* Note: MCC RF recovery (8:30-11:30AM) Down time<br>
 +
1/ Doug: Series of magnet measurement <: 1hr / no beam/ but beam permit<br>
 +
No controlled access<br>
 +
Once RF recovery is done, <br>
 +
2/ BCM calibration (high beam current 30uA(60 ideal) with FC & empty target<br>
 +
- Calo. HV off<br>
 +
3/ Set up beam through Compton chicane<br>
 +
4/ Production Data with stable beam current<br>
 +
 
  
 
* Detailed instructions [https://hallaweb.jlab.org/ here]
 
* Detailed instructions [https://hallaweb.jlab.org/ here]

Revision as of 09:46, 3 March 2016

Go back to Daily Run Plan Daily Run Plans

  • General considerations

Specific mission

  • Note: MCC RF recovery (8:30-11:30AM) Down time

1/ Doug: Series of magnet measurement <: 1hr / no beam/ but beam permit
No controlled access
Once RF recovery is done,
2/ BCM calibration (high beam current 30uA(60 ideal) with FC & empty target
- Calo. HV off
3/ Set up beam through Compton chicane
4/ Production Data with stable beam current


  • Detailed instructions here


BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++