* Note: MCC RF recovery (8:30-11:30AM) Down time<br>
 
* Note: MCC RF recovery (8:30-11:30AM) Down time<br>
 
1/ Doug: Series of magnet measurement <: 1hr / no beam/ but beam permit<br>
 
1/ Doug: Series of magnet measurement <: 1hr / no beam/ but beam permit<br>
No controlled access<br>
+
- <b>No controlled access !</b><br>
 
Once RF recovery is done, <br>
 
Once RF recovery is done, <br>
 
2/ BCM calibration (high beam current 30uA(60 ideal) with FC & empty target<br>
 
2/ BCM calibration (high beam current 30uA(60 ideal) with FC & empty target<br>

Revision as of 09:47, 3 March 2016

Go back to Daily Run Plan Daily Run Plans

  • General considerations

Specific mission

  • Note: MCC RF recovery (8:30-11:30AM) Down time

1/ Doug: Series of magnet measurement <: 1hr / no beam/ but beam permit
- No controlled access !
Once RF recovery is done,
2/ BCM calibration (high beam current 30uA(60 ideal) with FC & empty target
- Calo. HV off
3/ Set up beam through Compton chicane
4/ Production Data with stable beam current


  • Detailed instructions here


BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++