Difference between revisions of "Thursday, Mar. 03: DAY Shift"

From Hall A Wiki
Jump to: navigation, search
Line 11: Line 11:
 
- Experts will perform this (Dave/Thir/...)
 
- Experts will perform this (Dave/Thir/...)
 
- Calo. HV off<br>
 
- Calo. HV off<br>
 +
Instruction: <br>
 +
[http://hallaweb.jlab.org/equipment/BCM/HallA_BCM_linearity.pdf DOC1][http://hallaweb.jlab.org/equipment/BCM/HallA_Unser_0L02_cal.pdf DOC2]
 +
<br>
 
3/ Set up beam through Compton chicane<br>
 
3/ Set up beam through Compton chicane<br>
 
4/ Production Data with stable beam current<br>
 
4/ Production Data with stable beam current<br>
Line 16: Line 19:
  
 
* Detailed instructions [https://hallaweb.jlab.org/ here]
 
* Detailed instructions [https://hallaweb.jlab.org/ here]
 +
 +
 +
 +
 +
<b>Upcoming event(Long Term)</b>
 +
* Beam study (Thursday, 3/10)
 +
* Target boiling test
 +
  
  

Revision as of 09:56, 3 March 2016

Go back to Daily Run Plan Daily Run Plans

  • General considerations

Specific mission

  • Note: MCC RF recovery (8:30-11:30AM) Down time

1/ Doug: Series of magnet measurement <: 1hr / no beam/ but beam permit
- No controlled access !
Once RF recovery is done,
2/ BCM calibration (high beam current 30uA(60 ideal) with FC & empty target
- Experts will perform this (Dave/Thir/...) - Calo. HV off
Instruction:
DOC1DOC2
3/ Set up beam through Compton chicane
4/ Production Data with stable beam current


  • Detailed instructions here



Upcoming event(Long Term)

  • Beam study (Thursday, 3/10)
  • Target boiling test


BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++