Difference between revisions of "Thursday, Mar. 03: DAY Shift"

From Hall A Wiki
Jump to: navigation, search
Line 2: Line 2:
 
* General considerations
 
* General considerations
 
** Last night, MCC had a trouble by beam los at 3C00 BLM till around 11PM.
 
** Last night, MCC had a trouble by beam los at 3C00 BLM till around 11PM.
** After reconstructed optics beam line, we had 10uA for production runs.
+
** After reconstructed optics beam line, we had 10uA for some production runs during OWL.
  
 
<b>Specific mission</b>
 
<b>Specific mission</b>

Revision as of 10:25, 3 March 2016

Go back to Daily Run Plan Daily Run Plans

  • General considerations
    • Last night, MCC had a trouble by beam los at 3C00 BLM till around 11PM.
    • After reconstructed optics beam line, we had 10uA for some production runs during OWL.

Specific mission

  • Note: MCC RF recovery (8:30-11:30AM) Down time

1/ Doug: Series of magnet measurement <: 1hr / no beam/ but beam permit
- No controlled access !
Once RF recovery is done,
2/ BCM calibration (high beam current 30uA(60 ideal) with FC & empty target
- Experts will perform this (Dave/Julie/Thir/...) - Calo. HV off
Instruction:
DOC1DOC2
3/ Set up beam through Compton chicane
- Dave starts to turn on laser for warming up
4/ Production Data with stable beam current


  • Detailed instructions here



Upcoming event(Long Term)

  • Beam study (Thursday, 3/10)
  • Target boiling test (60uA)


BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++